Laserfiche WebLink
ESHIHIT D <br />MINING PLAN MAP <br />Revision Narrative, 12-92 <br />The revised map shows the mining plan and sequence changes. The <br />power line will be located underground along the access road. <br />Phases 3 through 6 have been rearranged so that Phase 3 is at the <br />south end of the permit area and Phases 4, 5, and 6 progress to <br />the north. This revised mining sequence allows the revegetation <br />on the high bank on the west side of Phase 2 to become <br />established before it becomes visible during mining in Phase 6. <br />The high bank should blend with the surrounding undisturbed area <br />and thus be less noticeable. <br />