Laserfiche WebLink
.~ <br />~ iii iiiiiiiiiiiuiii <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department nl Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO £•0203 <br />303 866-3!i67 <br />FA X: 303 B32-8106 <br />Roy Romer, <br />Governor <br />September 9, 1991 <br />Kit Carson County <br />P.O. E~ox 249, 251 16th Street <br />Burlington, CO 80807 <br />Re: NI-91-071, Bohnen Pit, Permit Issuance <br />Mr. Edgar Pratt, Commissioner <br />Dear Nlr. Pratt: <br />OF' ~~/p <br />~ ~9Q <br />H`~ ~~~--yy11 O <br />~;~lT. <br />~ ~8]e ~ <br />Fretl R. Banta, <br />Division Director <br />On September 6, 1991, the Mined Land Reclamation Division found Kit Carson <br />County to have satisfied the applicable requirements of C.R.S. 34-32-101 et <br />seq. for obtaining a mining and reclamation permit. Therefore, a permit is <br />Ong issued. Two signed originals of the permit have been executed. We have <br />kept one copy for our files and are enclosing one copy for your use. Please <br />read the terms of the permit. It is your responsibility to comply with all of <br />the terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, September 6, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />E120.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Si ncerely, <br />David I_. Bucknam <br />Acting Director <br />DLB/ern <br />4109G <br />