Laserfiche WebLink
- TYPE OR PRINT CLEARLY <br />"ti' :14. Present land use <br />~~_ Trri gatorl~etnro anA Aa3. TanA <br />+~ (i.e., agricultural, ustrial, etc.) <br />i~'- <br />°` 15. Proposed future land use T_rrieared PaatnrP <br />(Goal of reclamation) <br />INSTRUCTIONS: This application ford oust be submitted in duplicate and each form must <br />be accompanied by thlle €olloving information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10y) for additional guidance. <br />EIO3IBIT A - Legal Description <br />The Legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by zeference to township, range, and section to at least the <br />nearest quarter quarter section. IJhere applicable, the street address or lot <br />aumbar(s) may be used. <br />EXHIBIT B - .iiniast Plaa <br />This can be a general discussion of the methods. equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the man and should show where extraction will begin, which <br />direction it will proceed. <br />EXHIBIT C - Map <br />This map should be as comprehensive as possible is *_erms of clearly defining <br />the permit boundaries aad iaditat~g all roads ar stoclcpile areas to be used is <br />coaaection with the operation. All immediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also ba shawa on the man. <br />EXHIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined in the <br />applicable Rule, under item number ten (10). <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should ba a general discussion of the methods, <br />equipment, phases or stages of Lha reclamation process and those portions o£ <br />lead affected by each. If possible, the play should be closely correlated <br />with the map. If na~t, the narrative must be comprehensive enough to draw as <br />accurate verbal picture of the expected physical appearance of the area after <br />completion of reclamation. <br />EXHIBIT F - Proof of Local Government Approval <br />This must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />EXHIBIT G -Source af.Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tea <br />receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PE&`1ITS ONLY** <br />EXHIBIT H - Reclamation Costs <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. ' <br />ECf:IBIT I - Texas of Governaental Contract <br />The operator moat submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governme¢tal contract, if it was required. <br />