Laserfiche WebLink
PART I <br />Page No. l2 <br />Permit No. CO-0045080 <br />~. GENERAL MONITORING, SAMPLING AND REPORTING REQUQtEMENTS <br />6. .~irnatorv and Certification Rgauirementc <br />ii. The authorization specifies either an individual or a position having responsibility for the overall operation of the <br />regulated facility or activity such as the position of plant manager, operator of a well or a well field, <br />superin[endent, position of equivalent responsibility, or an individual or position having overall responsibility for <br />environmental matters for the company. (A duly authorized representative may thus be either a named individual <br />or any individual occupying a named position); and, <br />iii. The written authorization is submitted to the Division. <br />c. if an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications to be signed by an <br />authorized representative. <br />d. The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"I certify under penalty of law that this document and all attachments were prepazed under my direction or supervision <br />in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information <br />submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly <br />responsible for gathering the information, the information submitted is [o the best of my knowledge and belief, true, <br />accurate and complete. I am awaze that there aze significant penalties for submitting false information, including the <br />• possibility of fine and imprisonment for knowing violations." <br />• <br />