Laserfiche WebLink
RECLAl111TI0N LOST SUMMARY cmt'd <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Descri prim <br />n/a <br />L. DRILL HOLE/MONITORING NELL SEALING <br />Task No.~ Task Descriptim <br />n/a <br /> <br />sheet 4 of 4 <br />Cost (f) <br />Subtotal (K): <br />Cost (f) <br />Subtotal (l): <br />N. MISCELLANEOUS RECLAIDITION TASKS <br />Task Mo.~ Task Descriptim ~ Cost (f) <br />4 ~ Tree removal, felling, etc, removal from site ~ 59,741 <br />4 ~ Demolitim of weigh station, removal from site ~ 57,641 <br />5 ~ Seeding ~ 228,312 <br /> Fencing <br />b ~ Mob/Demob ~ 52,174 <br />' Subtotal (M): 241, 868 <br />------------ <br />TOTAL DIRECT RELLAIUTION LOSTS (subtotals A through M): 2726,866 <br />11. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description <br />Cost (S) <br />___ <br />1. I_________________________________ <br />~ Public Liability Insurance.... _________________I_ <br />1.550% of dir. ~ __________. <br />f1, 966 <br />2. ~ Cmtrector's Performance Bond 0.975% of dir. ~ f1,237 <br />3. ~ Cmtractor's Profit........... 10.00% of dir. ~ 212,687 <br />4. ~ Jab Superintendent.. <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (dii <br />B. DNG PROJECT ADNIMI STRATTON EXPENSES <br />Item No.l Item Descriptim <br />._.___._I__~______________________________. <br />1. ~ Cmtract Prep., Eng. Fees..... <br />2. ~ Staff Adni n. Expenses......... <br />subtotal (A): f15,890 <br />act plus 0 8 P): 5742,756 <br />Cost (f) <br />__....__________I________r_ <br />4.25% of cn[r.~ (6,067 <br />0.75% of cnt r.~ f1, 077 <br />NET INDIRECT LOST PERCENTAGE: 18.75% Subtotal (B): 57,138 <br />TOTAL INDIRECT RECLAMATION LOSTS (subtotals A through B): 523,028 <br />TOTAL PERfOR11ANCE BOND AMOUNT (direct plus indirect costs): f149,894 <br />