Laserfiche WebLink
~orado Division of Nirerals and Geology • <br />ESTIMATING FORM - M070R GRADER MdtK <br />Task K: 9pr Prep, try: RCO Tesk File Mame: M005-9pr <br />Date: 02/09/95 Permit M:M-94-005 Mire: Colons Pit Amm~drent Am-007 <br />~ Permit Action: Reelemetion of Phases I-III, rev <br />Task Description: Finish grade topsoil, 40 ec <br />HOURLY EOUIPNENT COST <br />_____ _______ _______ Bes is Machine: CAT 130 SERIES G Norsepoyer: 135 <br />Attachment Yi: N/A Shift Besi e: 7/day <br />Attachment N2: M/A --------- <br />Cost BreakdoYn: ----------------- <br />-------------- Utilization X (DOI Ofll) <br />dmership coat/hr = (15.05 N/A <br />Operatirp 8 overhaul coat/hr -grader = (16.09 100 <br />-ripper = f0.00 N/A <br />Operator cost/hr = f21.76 N/A <br />Total eopt. unit Lost/hr = f52.90 Total fleet Lost/hr: 552.90 <br />MATERIAL QUANTITIES <br />Total area to be graded: 40.00 acres <br />Source of quantity take-off: application <br />HOURLY PRODUCT IOM <br />Selected grading activity/work Level: Nadium grading only <br />Unadjusted hourly unit production: 7.44 acres/hr (Cat Handbook OSR) <br />Job Condi lion Correction Factors: <br />Avg site altitude 6220 ft. <br />Altitude adjustment: 7.00 (Cat HanWok )os) <br />Job efficiencY•••• 0.83 (ish/day Y6A) <br />Net Jab Correction: 0.83 <br />Adjusted hourly unit production: 7.20 at res/hr <br />Adjusted hourly fleet production: 1.20 acres/hr <br />JOB COST <br />Fleet size 1 Grader(s) Total Job Time: 33.47 Xours <br />Unit Cost 544.263 /acre Total Job Cost: f1,770.52 <br />