Laserfiche WebLink
SEDCAD 4 for Windows <br />Copyright 1998 Pamela J. Schwab <br />Civil Solnvare Design <br />• <br />Structure Detai/; <br />Structure #1 (Pond) <br />Pond A <br />Pond Inputs: <br />Initial Pool Elev: 6,040.50 <br />Initial Pool: 0.07 ac-ft <br />Drop Inlet <br />Riser <br />Riser Height Barrel <br />Barrel Barr <br />l Slope <br />' <br />Diameter <br />(~) e <br />Diameter <br />Length (ft) (/o) s n Spillway Elev <br />Manning <br />(in) (in) <br />18.00 2.00 18.00 50.00 1.00 0.0240 6,040.50 <br />Pond Results: <br />Peak Elevation: 6,040.83 <br />Dewater Tme: 0.51 days <br />• Dewateiing time is calcu/ated from peak stage to lowest spillway <br />Elevation-Capacity_Discharge Table <br />C <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(cfs) Dewater <br />Tme <br />(hrs) <br />6,036. 00 0.002 0.000 D.000 <br />6,036. 50 0.004 0.001 0.000 <br />6,037. 00 0.006 0.004 0.000 <br />6,037. 50 0.009 0.007 0.000 <br />6,038. 00 0.012 0.013 0.000 <br />6,038. 50 0.015 0.019 0.000 <br />6,039. 00 0.019 0.028 D.000 <br />6,039. 40 0.023 0.036 0.000 <br />6,039. 50 0.023 0.039 0.000 <br />6,039. 70 0.025 0.044 0.000 <br />6,040. 00 0.026 0.052 0.000 <br />6,040. 40 0.032 0.064 0.000 <br />6,040. 50 0.033 0.067 0.000 Spillway #1 <br />6,040. 70 0.036 0.074 1.309 12.00 <br />6,040. 83 0.037 0.078 2.916 0.15 Peak Stage <br />6,041. 00 0.039 0.085 5.165 <br />Filename: Io25yr.sc4 <br />Printed OB-22-20 00 <br />