My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46030
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:19 PM
Creation date
11/20/2007 12:34:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982036
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT L - RECLAMATION COSTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• PROJECT -Haul Road Reclamation <br />(Ripping Road) <br />EQUIPMENT: D-8K Dozer with ripper <br />ASSUMPTIONS: <br />Efficiency = 80°.6 <br />Altitude Adjustment = 93% <br />RR = N/A <br />Seismic Velocity = 4,000 fps (estimated) <br />Conditions =Medium <br />Reclamation of the haul road will require ripping the top 3 feet of mate- <br />rial prior to removing any surfacing material. <br />Maximum length of haul road = 2,640 feet <br />• Average haul road width = 30 feet <br />PRODUCTION = 1,250 cubic yards/hour (ripping -Cat Handbook, p. 60) <br />ACTUAL PRODUCTION = Ideal x Alt. Adj. x Eff. <br />= 1250x.93x.80 <br />= 930 cubic yards/hour <br />VOLUME 2640'L x 30'W x 3'D <br />27 cu. ft. cu. yd. <br />= 8,800 cu. yds. <br />TIME = 8,800 r 930 <br />= 9.5 shifts <br />• COST= 9.5 shifts x $994.28/shift <br />_ $9,445.66 <br />L-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.