Laserfiche WebLink
Blue Mountain Energy, Inc. <br />12RB802-2 <br />Initial Approval Colorado Department of Public Health and Environment <br />page 4 Air Pollution Control Division <br />• If the emissions increase by 50% or five (5) tons per year, whichever is less, above <br />the level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or <br />activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of <br />control equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />No later than 30 days before the existing APEN expires. <br />16. All previous versions of this permit are canceled upon issuance of this permit. <br />17. Within one hundred and eighty days (180) after commencement of operation, compliance with <br />the conditions contained on this permit shall be demonstrated to the Division. It is the <br />permittee's responsibility to self certify compliance with the conditions. Failure to demonstrate <br />compliance within 180 days may result in revocation of the permit. Ilnformation on how to <br />certify compliance was mailed with the permit or can be obtained from the Division at 303-692- <br />3209.) <br />18. Construction of the secondary crusher and screen must commence within 18 months of the <br />issuance date of Initial Approval Modification 4 (which was issued on May 23, 2001) or within <br />• 18 months of date on which such construction or activity was scheduled to commence as <br />stated in the application for Initial Approval Modification 4. If commencement does not occur <br />within the stated time tfie portions of this permit pertaining to tfie secondary crusher and <br />screen will expire on November 23, 2002. (See General Condition No. 6., Item 1.) (Reference: <br />Regulation 3, Part B, IV.G.4.) <br />R K Hancock III mes S. Geier P.E. <br />Permit Reviewer Unit Leader <br />Issued: Initial APProval issuetl Juna 30, 1991 <br />Initial Approval Motlification 1 issuetl October 19, 1993 <br />Initial Approval Motlification 3 issuetl April 24, 1998 <br />Final APprpvel Motlification 3 issued April 15, 1998 <br />Initial ADpmval Motld¢auon 4 issued May 33, 2001 <br />Motlification 1: Amentletl to increase raw cpel prpcessin6 Irpm 1.8 million to 7.7 million tons/year. <br />Motlil~cahon 2: ChenBa processing setup to bypass coal cleaning end add crushing entl screening. <br />Motlilmauon 7: Change name to Blue Mountain Energy. Inc. <br />Motlilmatian 4: Increasing throuBhpuu Irom 70.000 tons Der tlaY and 7,300,000 tons per year for mining. 150 tans per hour entl 300,000 <br />tons par year for crushing. 1500 tons per Aar entl 1,000.000 tans per year for screening: Reissue as IniLal Approval for <br />make, model, serial number al processing equipment, entl sell~cartilication, etc. for new equipment <br />Motlilicallon 5: Atltling oversize coal reject system, increasing throughput to Drimery cvsher to eccpmmotlata oversize relect coal. <br />Notes to Permit Holder: <br />• <br />103/0014/003 <br />var. 2/00 <br /> <br />