My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE46006
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE46006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:18 PM
Creation date
11/20/2007 12:33:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
5/13/2004
Doc Name
Emission Permits
Section_Exhibit Name
Illustration 43
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />R%pF' COQ <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT <br />AIR POLLUTION CONTROL DIVISION '`^e~ ~~ <br />TELEPHONE: 13031692-3150 {+ a~ <br />• IB76 a` <br />CONSTRUCTION PER11nIT <br />PERMIT NO: OOR60283 <br />INITIAL APPROVAL <br />DATE ISSUED: MAY 23, 2001 <br />ISSUED TO: Blue Mountain Energy, Inc. <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Deserado coal mine located approximately 7 miles northeast of Rangely, Rio Blanco <br />County, Colorado. <br />• <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Coal mine ventilation shaft known as the B-Mine Return Shaft, 350,000 cfm. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION AND <br />CONTROL ACT C.R.S. (25-7-101 et 9eg1, TO THOSE GENERAL TERMS AND CONDITIONS INCLUDED <br />IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of <br />the source. During periods of startup, process modification, or adjustment of control <br />equipment visible emissions shall not exceed 30°h opacity for more than six minutes in any <br />sixty consecutive minutes. Opacity shall be measured by EPA Method 9. (Reference: <br />Regulation 1, Section II.A.1.& 4.1 <br />2. Construction of this source must commence within 18 months of initial approval permit <br />issuance date or within 18 months of date on which such construction or activity was <br />scheduled to commence as stated in the application. If commencement does not occur <br />within the stated time the permit will expire on NOV@BEB 23, 2002 <br />(See General Condition No. 6., Item 1.1 (Reference:Regulation 3, Part B, IV.G.4.) <br />3. Emissions of air pollutants shall not exceed the following limitations las calculated in the <br />Division's preliminary analysisl: (Reference: Regulation 3, Part B, III.A.4) <br />Particulate Matter: 5.73 tons per year. <br />PM10 (Particulate Matter<10 µm1: 5.73 tons per year. <br />• <br />103/0014/009 <br />ver. 2/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.