Laserfiche WebLink
• <br />Blue Mountain Energy, Inc. <br />Permit No. 12RB802-5 <br />Final Approval Colorado Department of Public Health and Environment <br />page 2 Air Pollution Control Division <br />4. This source shall be limited to a maximum production rate as listed below and all other <br />activities, operational rates and numbers of equipment as stated in the application. Monthly <br />records of the actual production rate shall be maintained by the applicant and made <br />available to the Division for inspection upon request. (Reference: Regulation 3, Part B, <br />III.A.4) <br />Production/Processing of coal shall not exceed 20,000 tons per day or 2,400,000 tons per <br />year. <br />Compliance with the yearly production limits shall be determined on a rolling twelve 112) <br />month total. <br />5. All conveyors shall have conveyor covers and transfer points shall be fully enclosed. <br />6. A Revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg. 3, Part <br />A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />L <br />For sources emitting less than 100 tons per year, a change in actual emissions of <br />five tons per year or more, above the level reported on the last APEN submitted; or <br />For sources emitting 100 tons per year or more, a change in actual emissions of five <br />percent or 50 tons per year or more, whichever is less, above the level reported on <br />the last APEN submitted; or <br />For any non-criteria reportable pollutant: <br />If the emissions increase by 50% or five 15) tons per year, whichever is less, above <br />the level reported on the last APEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any facility, process, or <br />activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of <br />control equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. <br />• <br />103!0014/005 var. 2/00 <br />.~I <br />