Laserfiche WebLink
COLOWYO COAL COMPANY <br />010A-EAST TAYLOR <br />SEDIMENTATION POND SUMMARY <br />/ ' <br />J <br />/ ORIGINAL 1996 1998 2002 DIFFERENCE <br /> CONFIGURATION STUDY STUDY DIFFERENCE STUDY 1998 T02002 <br />ATERSHED AREA (acres): <br />Disturbed 0.0 0.0 0.0 0.0 <br />Postmining Topsoiled and Seeded 100.0 126.0 26.0 188.5 62.5 <br />Postmining Undisturbetl 300.0 148.3 -151.7 250.0 101.7 <br />t-2 Year ReUamation 30.2 70.5 40.3 74.6 4.1 <br />3+Year ReUamaeon 515.9 573.8 57.9 535.2 -38.6 <br />Total Area 946.1 918.6 -27.5 1048.2 129.6 <br />POND PARAMETERS: <br />Bottom Elevation 6930.0 6930.0 6930.0 0.0 6930.0 0.0 <br />Principal Spillway Invert Elevation 6952.0 6950.0 6952.0 2.0 6952.0 0.0 <br />Emergency Spilhvay Irnert Elevation 6954.0 6954.0 6954.0 0.0 6954.0 0.0 <br />Top of Embankment 6956.0 6956.0 6956.0 0.0 6956.0 0.0 <br />Storage Volume Below Emergenoy Spillway (ao-R) 8.58 8.58 8.58 0.00 9.1 0.5 <br />Storage Volume Below Prncipal Spillway (ao-ft) 7.01 5.62 7.01 1.39 7.5 0.5 <br />Principal Spillway Parameters: <br />Type Drop Inlet Drop Inlet Perf. Riser Pert. Riser <br />Riser Diameter (in) 18.0 18.0 18.0 0.0 18.0 0.0 <br />Riser Height (R) 10.2 8.2 10.2 2.0 10.0 -0.2 <br />Barrel diameter (in) 18.0 18.0 18.0 0.0 18.0 0.0 <br />Elevation of Perforation(s) (R) N/A N/A 6944.0 6944.0 <br />Size of Perforation(s) (in) N/A N/A 4.0 4.0 <br />Number o(Perfora8ons N/A N/A 2 2.0 <br />Emergency Spillway Parameters: <br />Type Trapezoidal Trapezoidal Trapezoidal Trapezoidal <br />Diameter (in) N/A N/A N/A WA <br />Bottom Width (ff) 20.0 20.0 20.0 0.0 20.0 0,0 <br />Length (R) 20.0 25.0 20.0 -5.0 20.0 0.0 <br />Side Slopes'i H:iV (R) 3.0 3.0 2.0 -1.0 2.0 0.0 <br />HYDROLOGICRiVDRAULIC PARAMETERS: <br />Base Flow Rates (US) 1.00 0.03 -0.97 0.00 0.0 <br />10-Year, 24•Hour Storm Event: <br />Precipitation (in) 1.8 1.8 0.0 1.8 0.0 <br />Runoff Volume (ao-ft) 5.9 7.5 1.6 7.3 -0.2 <br />Principal SpilNvay Peak Discharge (c(s) 15.9 4.0 -11.9 2.2 -1 8 <br />Emergenry Spillway Peak Discharge (cfs) 0.0 0.0 D.0 0.0 0.0 <br />Peak Surtace Water Stage Elevation (R) 6953.5 6952.3 -1.2 6950.7 -1.6 <br />25-Year, 24-Hour Slortn Event: <br />Precipitation (in) 2.3 2.3 0.0 2.3 0.0 <br />Runoff Volume (ao-R) 10.2 13.0 2.8 15.7 2.7 <br />Prncipal Spillway Peak Discharge (c(s) 18.5 12.0 -6.5 10.1 -1.9 <br />Emergenry Spilhvay Peak Discharge (cfs) 25.1 3.7 -21.4 0.0 -3.7 <br />Peak Sudace Water Stage Elevation (R) 6954.8 6954.1 -0.7 6953.4 -0.7 <br />Pond Freeboard (h) 1.2 1.9 0.7 2.6 0.7 <br />SEDIMENT LOADING PARAMETERS: <br />Storm Predicted Peak Settlable Concentration (ml/l) 0.00 0.00 0.0 0.00 0.0 <br />Predicted Annual Sediment Loading (acft) 0.37 1.13 0.76 0.90 -0.2 <br />Available Sediment Storage Volume (ao-R) 1.88 1.88 0.00 2.13 0.3 <br />Maximum Sediment Storage Elevation (R) 6941.8 6941.6 6941.8 0.0 6942.0 0.2 <br />Predictetl Number of Storage Years 5.1 1.7 -3.4 2.4 u <br />0.7 <br /> <br />