My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45888
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:12 PM
Creation date
11/20/2007 12:31:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 15 MR1 THROUGH MR20
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M~Iz - - <br />PEABODY COAL COMPAN <br />• <br />ROCKY MOUNTAIN DIVISION <br />10a7! EA9T HARVARD AVENUE <br />SUITE •00 <br />DENVl R. COLORADO l03af <br />uoaf aareaoa <br />July 5, 1984 <br />Ms. Sandra Emrich <br />Reclamation Specialist <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Sandy: <br />RE: MINOR REVISION N0. 12 - ADDITIONAL POND <br />FOR TRUCK MASH FACILITY, SENECA II <br />PERMIT NO. C-005-80 <br />Attached please find five (5) copies of Exhibit "7-16" (revised) <br />. Truck Wash Facilities Layout. This minor revision requests permission <br />to construct an additional pond at the proposed truck wash facility. <br />This facility was originally submitted and approved May 25, 1984 as <br />Minor Revision No. 9 to C-005-80. <br />The original design incorporated a high pressure line and corresponding <br />pumps to feed the truck wash directly from the Wadge Impoundment. <br />This revised design allows the contuuction of a lower pressure water <br />line and a smaller capacity pump to be used. Water from the Wadge <br />Impoundment will be pumped into the line and gravity fed to Water <br />Supply Cell No. 2 on an as needed basis. A high pressure line will <br />be run between this cell and the truck wash. <br />The area in which Cell No. 2 is proposed is presently disturbed by <br />the facilities (i.e., parking, storage, etc.). Reclamation of this <br />cell will be performed in conjunction with the other facilities at <br />the end of mining. <br />Should you have any questions please don't hesitate to call, <br />Sincerely, <br />/ OK^- l~l~p~,~ <br />Tom Wainwright Y <br />• Colorado Project Manager <br />7JW:kt <br />Attachment <br />cc: Mike Gobla, w/o att. <br />Craig Jennings <br />Floyd Johnson - OSM <br />Leonard Shearer, w/o att. <br />
The URL can be used to link to this page
Your browser does not support the video tag.