Laserfiche WebLink
Final Reclamation Map attached, showing 5 Phases and 3 lakes. This was worked <br />out with the local ditch people and approved by the County. <br />The inlet would be Phase V; Outlet Phase I. <br />I need to get you the map recorded in Weld County. How many do you need? <br />We would prefer not adding the expense to this operation as, in many cases, <br />much less soil is replaced. We'll commit to a minimum of 1' of local topsoil. <br />Critical areas are those that get poor growth the first season. <br /> <br />Exhibit D, Paragraphs 1, 2 & 3 - 10 CY per LF dozed @ $0.30/CY = $30,000,00 <br />$600/Mo x 1 Mo = $600.00. <br />5565 CY @ $1.00 Icy Scraper = $5565 00. <br />