My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45851
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:10 PM
Creation date
11/20/2007 12:30:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001060
IBM Index Class Name
Permit File
Doc Date
7/20/2001
Doc Name
CIRCES COST ESTIMATING SOFTWARE COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Tasktt: 001 <br />Date : 07/20/2001 <br />User : KAP <br />Agency or organization name : CODMG <br />Permit or other job action :new <br />Task description : grade high wall <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 11,924 <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Moffat <br />Site :Deakins Pit <br />Basic machine : Ca[ D7R - 7U <br />Blade type :Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 : NA <br /> Utilization <br />OwnershipcosVhour: $37.61 NA <br />Operating cost/hour : $49.66 100 <br />Ripper op. cosVhour : $0.00 NA <br />Operator cost hour : $27.99 NA <br />Total unit cosUhour : $115.26 Total fleet cosUhour <br />$115.26 <br />Swell Loose <br />LCY factor : NA volume : 11,924 LCY <br />Source of estimated volume :exhibit e <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 80 feet <br />Unadjusted hourly production : 786.0 LCY/hr <br />Material consistency description <br />Compacted sill or embankment <br />Average push gradient : 10.00 % (i <br />Average site altitude : 6,180 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv Racked <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 0.90 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUday <br />Spcil pile : 0.80 (fnd-rf) <br />Push gradient : 1.22 (Cat HB) <br />Altitude : 0.95 (Cat H6) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U; <br />Net correction : 0.47 <br />Adjusted unit production <br />Adjusted fleet production <br /> <br />Permit/jobN : M-01-060 <br />Abbreviation :none <br />Filename : M060-001 <br />Horsepower : 230 <br />Shift basis : 1 per day <br />369.78 <br />369.78 <br />Data source : (CRG) <br />LCY/hr <br />LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 32.25 Hours <br />Unit cost : $0.312 /LCY Total job cost : $3,717 <br />
The URL can be used to link to this page
Your browser does not support the video tag.