Laserfiche WebLink
Bowls No. 2 Mine <br />Material Balance <br /> cover stockpile Topsoil stockpile <br />• cut fill volume volume <br /> Item cu.yda. cu.yda eu.yda cu.yds ~I <br /> start up: <br /> Central Rldga removal to el. 8035 5311 <br /> cut fill malarial from toe 79000 24311 <br /> sod pond embankment fill 558 23753 <br /> aed pond embankment cut 242 23995 <br /> toe diECh cut 80 24075 <br /> toe to pond ditch cut 70 24145 <br /> cut upland ditch 287 24412 <br /> cut Initlal haul road 3333 27745 max eoverfill stockpila <br /> Wpsoil removal 1198 1198 <br /> build to first bench: <br /> remove central ridge to el 6085 2021 <br /> topsoil up to first baneh 500 698 <br /> cover up to first bench 3970 25796 <br /> build to saeond baneh: <br /> rsmova central ridge to el 6135 237 26033 <br /> topaoll removal 1318 2016 <br /> fill second swNehback 200 25833 <br /> cut second switchback BIlB 28721 <br /> cover to second baneh 4963 21758 <br />• topsoil to saeond bench 500 1518 <br /> build to third bench: <br /> topsoil removal 1011 2527 <br /> fill fourth switchback 300 21458 <br /> eulfourth swhchbeck 1056 22514 <br /> cover up to third baneh 5659 16855 <br /> topsoil to third booth 625 1902 <br /> build up to creaC <br /> topsoil removal 1210 3111 max topsoil stockpila <br /> cover up to crest 7140 9715 <br /> topsoil up to crest 500 2611 <br /> cover erect 8837 1078 <br /> topsoil treat 875 <br /> available final cover for roads 1077.5 1736 <br /> ma8bel2.wg2 18-Dee-95 i <br />• <br />