My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45748
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:06 PM
Creation date
11/20/2007 12:28:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX K WASTE DISPOSAL SITE GEOTECHNICAL ANALYSIS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX B <br />• Guide Si:ecifications for Placement of_COmpactud Fi71 <br />GENERAL <br />A soils engineer shall be the owner's representative to observe and test <br />the earthwork placement, moisture content and compaction. T}rc soils <br />enyinaer shall review the fill materials and the method.. ui 11JCing and <br />compaction and shall give written results of observat.rons an.l tact <br />results. <br />_C LEA RI AIG AREA TO_BG FILL6: I7 <br />All vegetation, rubbish, and other deleterious matter shall 7„ cenlo vet, <br />from the area to receive fill, and disposed of. frozen mntctiJl ohall <br />be removed. Frc.~.en material may not 6u used as compact. fill. A>. ,: .rs <br />of loose, low density, spongy or saturated material not xem<ve<i by <br />clearing shall be removL:d. <br />SCARIFYZIJG AND COMPAC'P I!JG AkIiA TO BE FI L_LED <br />All organic matter and frozen material shall be rr_movo~! frcil~~ tnc nnrl .,co <br />upon which the fill is to 1)u pl•~ced and the surf.rce :,n 111 [rn r, L,~ 1,1,nouJ <br />or scarified to a depth of at 1L:ast six inches and smuot.hod untrl the <br />surface is free from ruts, hummocks or other uneven leJtnrl". 41111 ch would <br />tend to prevent uniform compaction. <br />Afton the ar i•a son the fill has been r]cared, frozen material r~~un>v c.i <br />and ti:e area plowed or scarified where necessary, it shall bl~ ur ;ced u. <br />laded until it is uniform and free from large clods. 1'hu sutlJC~ <br />~.ould then be brouyiTt to the proper moisture content and c„nln L. r•t cd tr, <br />a density specified below. <br />EI LL h7A TERTAL <br />Materials for the fill should consist of materials revicwr~d t,} the soil <br />engineer. The materials used sl,al] be free from orgauLC mJI L,I Crozul~ <br />material and other deleterious substances and shall nor civ.t.,in reek.:: <br />or lumps having a diameter of more than six inches. <br />DEp'T'H AND 1dI RING OF FILL LAYERS <br />The selected fill material shall be placed in horizontal layL~r~, r.ut t~ <br />exceed sir. inches compacted thickness, or eight inches loose thi ck.nuss. <br />Each layer shall be spaced evenly and shall be thoroughly mrxl. rl durinrl <br />the spreading [o provide uniformity of material in each layci. <br />MOISTURE CONTENT <br />The contractor may be required to add the moisture to the 1i1. material <br />in the excavation if, in the opinion of the soils engineer, it is not <br />possible to obtain uniform moisture content by adding water duri nr7 <br />placement and compaction. Additionally, the contractor shall not hl.a ce <br />backfill material which exceeds the maximum moisture content specifica- <br />tion, unless the material is left to aereate or blended with drier <br />material to achieve the specified moisture content. Compacted fill <br />should be placed at a moisture content within the limits, as defined by <br />• AB-1 <br />M85021GE <br />~lam6ert nnD ~.s,gori~te,~ <br />CONSUL TINO liE OiELN NIL AI LNGINEE R$ AND <br />MATE HIAL TFSIING <br />
The URL can be used to link to this page
Your browser does not support the video tag.