My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45698
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:48:03 PM
Creation date
11/20/2007 12:27:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Doc Name
pg 2.05-200 to 2.05-300
Section_Exhibit Name
2.05.6 Mitigation of Surface Coal Mining Operation Impacts Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mrne <br />Much of the information and assumptions used in the revised "time to fill" calculations have <br />remained the same. Those that have been modified since the 1994 estimate (for the Box Canyon <br />and SOD permit revisions) include: <br />• Approximate Apache Rocks Mining Area, including the three western and four eastern panels <br />(B Seam) - Longwall Panels (66,999,000 ft z) and Development Areas (20,022,000 ft.z) <br />• Approximate Box Canyon Mining Area (B Seam) - Longwall Panels (46,930,000 ft z) and <br />Development Areas (23,121,000 ft. ) <br />• Approximate IONS and 11NE Longwall Panel Area (B Seam) - Longwall Panels (6,603,000 <br />ft.) and Development Areas (4,362,000 ft.Z) <br />• Average sustained inflows (2003) observed into the mine (100 gpm, 161.3 AF/yr or 7,026,738 <br />ft 3/yr.) <br />• Maximum inflows (1996) observed into the mine (8,000 gpm) or (175,668,449 ft.3/yr) <br />• Approximate South of Divide mining azea El-E9 panels (E Seam) - Longwall Panels <br />(92,996,122 ftz) and Development Areas (1,787,471 fl <br />• Average additional sustained inflows into the E Seam workings from the SOD mining area (100 <br />. gpm or 7,026,738 ft.3/yr) <br />• Maximum additional inflows into the E Seam workings from the SOD mining azea (1,700 gpm) <br />Using these revisions to the "time to fill" calculations results in the following: <br />• Time to fill F Seam workings (100 gpm) = 14.9 yeazs <br />• Time to fill Jumbo Mountain (8NW and 9NV~ B Seam workings (100 gpm) = 17.7 yeazs <br />• Time to fill Northwest Panel (1NW to 7NVl~ B Seam workings (100 gpm) = 26.6 yeazs <br />• Time to fill Apache Rocks (three western and four eastern panels) B Seam workings (100 gpm) <br />= 65.8 years <br />• Time to fill Apache Rocks (three western panels) E Seam workings (100 gpm) = 31.0 years <br />• Time to fill the LONE and 11NE Panels B Seam workings (100 gpm) = 7.5 years <br />• Time to fill Box Canyon (18NE to 23NE) B Seam workings (100 gpm) = 49.9 yeazs <br />• Time to fill SOD (El-E9) E Seam workings (100 gpm) = 73.5 years <br />• <br />2.05-I63 Revised June 1005 PRIG; Rev. Mach 1006; Rev. May 1006 PRIO <br />