Laserfiche WebLink
1 <br />1 <br />EXHIBIT D (Cont'd) <br />Mining Timetable. Demand rates in this pit area are <br />highly variable. The operator's best estimate is that <br />mining will be completed in 2038. <br />Estimated Mining Timetable <br />Mining Average <br />Stage Years Total Acres t Annual Tonnage <br /> <br />I 1977-1981 7.66 251,400 <br />II 1982-1986 14.86 249,700 <br />III 1987-1991 4.55 251,500 <br />IV 1992-1996 5.72 251,500 <br />V 1997-2001 4.57 252,000 <br />VI 2002-2006 3.84 250,500 <br />VII 2007-2011 5.87 249,000 <br />VIII 2012-2016 7.53 249,000 <br />IX 2017-2021 5.17 247,200 <br />X 2022-2026 4.44 252,200 <br />XI 2027-2031 8.05 249,600 <br />XII 2032-2036 9.20 250,900 <br />XIII 2037-2038 (2.2 yrs) 5.15 108,000 <br />TOTAL ACRES t 86.61 <br />7 <br />