Laserfiche WebLink
1 <br />' EXHIBIT L <br /> RECLAMATION COSTS <br /> i <br /> The two consecutive phases requir <br />ng the great est amount <br />' of reclamation work are Phases I and II (5.61 acres t of <br /> perimeter slope grading, and 19.84 acres ± of reveg etation). <br />' Costs of reclaiming the area disturbed in Phases I and II <br /> have been estimated based on the following data: <br /> <br /> 1. Grass seed mixture, 5.50 lbs/ac @ $3.90/lb $ 21.45 <br />t Fertilizer, barnyard manure, 20 tons(ac <br /> @ $2.35/ton, as specified, delivered <br />' and spread 47.00 <br /> Mulch, straw, 65 bales/ac @ $0.70/bale 45.50 <br />' Labor, 16 man hrs/ac @ $6.00/ac 96.00 <br /> Per acre Total $209.95 <br />' 2. Seed mixture drilling and mulch crimping labor, <br /> 0.50/hrs/ac @ $40.00/ac 20.00 <br />' 3. Slope grading and reshaping, 2 hrs/ac @ $40/ac 80.00 <br />' Thus, reclamation costs for the combined acreage in <br /> Phases I and II are as follows: <br />' Reveg etation, 19.84 ac $ $209.95/ac...........$ 4,165.41 <br /> Seed mixture drilling and mulch crimping, <br />' 19.84 ac @ $20.00/ac .................... 396.80 <br /> Slope grading and reshaping, 5.61 ac @ $30/ac. 448.80 <br />t TOTAL RECLAMATION COSTS, PHASES 0 AND I.......$ 5,011.01 <br /> Plus 10% for state overhead 501.10 <br /> TOTAL $ 5,512.11 <br />1 <br /> <br />27 <br />f~ <br />