My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45491
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:51 PM
Creation date
11/20/2007 12:22:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000067
IBM Index Class Name
Permit File
Doc Date
10/12/2000
Doc Name
APPROVAL OF A REVISED 112C PERMIT APPLICATION RECLAMATION COST ESTIMATION FINANCIAL WARRANTY HIGH ME
From
DMG
To
CRANE ASSOCIATES LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />SCRAPER -ONLY WORK <br />PROJECT IDENTIFICATION <br /> Aganry or organization name : OMG <br />Task p : 002 State : Cobmdo Penniuob • : M-2000.087 <br />Date : 10H2l1000 County :Delta Abhreviation :none <br />User : WHE Site : Nlph Mesa Grarel Pit Filename : MO67-002 <br />Pennil or other job action : 1/2c revised permlr appllwtlon <br />Task description :Replace overburden over 13 acres at J' depth <br />. _._.- _ -r_,._._.__~ _- .,,,_..,. ___ _.,-.~ <br />----- ~ `-- -_- _J <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E (1996) Shifl basis : 1 per day <br />Cost Breakdown : Joh ulil¢ation % Horsepower : 475 <br />Ovmership cost hour: $65.79 NA <br />Operating cost hour: $108.16 100 Weight (UST): 56.00 <br />Operator cost/hour : $23.30 NA Cast data source : (CRG) <br />Total unit wstAtour : 5794.25 Total fleet cosOhour : 5194.25 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 62,920 LCY laclor: NA volume; 82,920 LCY <br />Soume of quantity tako-o8: (13ec)(43560s//acJ(3'O)27 = 62,920 cy <br />Scuma of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Hauling CaoaciN <br />Basis <br />Maladal description : Heaped volume : 34.00 LCY <br />Earth-Dry pecked Average volume: 34.00 LCY <br />Ralad payload: 82,000 pounds <br />Payload capacity: 32.16 LCY Adjusted capacity: 3218 LCY "' <br />Cycle Time (load+haul+soread+returnl: Loading lime: 0.90 minutes' <br /> Maneuver end spreading time : 0.70 minutes <br />Travel time : • loading ome per pair on push~pull models <br />Rohe Distance (feet) Grade (%) Roll, res.(%) Total res.(%) Velocity (fpm) Travel Ilme (min.) <br />Haul: 300 0.0 5.0 5.0 1,243 0.39 minutes" <br />Retum: 300 0.0 5.0 5.0 2,124 0.33 minNes'- <br />"bawl time adjustetl br accelenbon and decelerahon al loatl antl tlump poinR <br />Job Condition Conedion Factors <br />Sila altitude (feet) : 5,460 <br />Altitude adjustment factor : 0.96 <br />Job eRicienry laclor : O. B3 <br />Nel job correction factor : 0.80 <br />JOB TIME AND COST ~ ~. <br />Fleet size : 1 Scraper(s) <br />Total rycla time : 232 minutes <br /> <br />Adiusted HourN Production <br /> <br />Unadjusted unit production : 832.38 LCY/Hour"' <br />Adjusted unit pmduction : 663.24 LCYMcur <br />Adjusted fleet pmduction : BBJ.24 LCYMour <br />2 times wlume on push-pull motlels <br /> <br />Total job time : 94.87 Hours <br />Unit cost : E0.293 /LCY Total job cost : 518,428 <br />
The URL can be used to link to this page
Your browser does not support the video tag.