My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45475
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:50 PM
Creation date
11/20/2007 12:22:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
12/9/2005
Doc Name
District Court -Water Division 1 Findings Conclusions Decree - Approving GW Rights Plan of Augment
From
City of Black Hawk
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ,, , <br />Case No. 94CW036, Findings of Fact, Conclusions of Law and <br />Dtcree of the Court Approving Absolute and Conditional Ground <br />W ater Rights, Plan of Augmentation and for Change of W etcr Rights, <br />Application of the City of Black Hawk, <br />Page 43 <br />ground water rights priorities confirmed in paragraphs 13.c and 13.d herein shall be administered <br />based on the filing ofthe Second Amended Application in 2000 and shall bejunior in priority to water <br />rights for which applications were filed in previous years. As between water rights for which <br />applications were filed in the same calendar year, the relative priorities shall be determined by the data <br />of appropriation and. shall not be affected by the date of entry of the ruling or decree. <br />39. Pursuant to C.R.S. § 37-92-305(8), the State Engineer shall curtail all out-of-priority <br />diversions, the depletions from which are not so replaced as to prevent injury to vested water rights <br />40. Except to the extent that the Court has specifically retainedjurisdiction, this Judgment <br />and Decree is final. <br />41. It is hereby decreed that the change of water rights and the plan of augmentation <br />described herein are approved and meet the standards prescribed in C.R.S. § 37-92-305, and will not <br />injuriously affect any owner of or person entitled to use water under a vested water right or a decreed <br />conditional right. <br />It is therefore, ORDERED ADJUDGED AND DECREED by the Court that the application <br />for absolute and ground water rights, approval of plan for augmentation and change of water rights is <br />hereby granted. <br />IT IS FURTHER ORDERED that a copy ofthis decree be filed with the appropriate Division <br />Engineer and the State Engineer. <br />IT IS FURTHER ORDERED that the conditional right herein awarded to the Black Hawk <br />North Clear Creek Well in the amount of 10 g.p.m. (0.023 c.fs.) is hereby continued in full force and <br />effect until the last day of the month of Au st, 2009. If the Applicant desires to maintain such <br />conditional decree, an application for a finding of reasonable diligence shall be f led on or before the <br />last day of the month of Au ust 2009, or a showing made on or before such date that the conditional <br />water right has become an absolute water right by reason of completion of the appropriation. <br />DATED: August 22, 2003. <br />:~~~~!_~n~tJ <br />Jortarhan W. bays <br />Stntior Distfict Catut Warer Judge <br />Water Division No.1 <br />TFk OFntor »m jP7ed rrrenarurdlyparaaam to Ralr 127, f !•]Q 7Yr nripiuaf rimed ordt. it hrAr C'aart'rJPh. <br />
The URL can be used to link to this page
Your browser does not support the video tag.