Laserfiche WebLink
Case Na 94CW036, Findings of Fact, Conelusrons or Law and <br />Deeret of the Court Approving Absolute and Conditional Ground <br />Water Rights, Plan o! Augmentation and for Change of Water Rights, <br />Application of the City of Black Hnwk, <br />Page 10 <br /> APPROPRIATION <br />NAME SOURCE AMOUNT DATE CASE NO. LECALDESCRIPTION <br /> ADJUDtCAT1ON <br /> • DATE <br /> Creek,a tributaryto <br /> North Clear Creek, <br /> and water diverted <br /> from 1Torth Clear <br /> Creek, <br />Black Hawk Chase Chase Gulch, a 600 acre-ke[ SR9l1992 92CW056 Black Hawk Chase Gulch Rtservoirwiil be <br />Gulch Reservoir tributary to North conditional, with (trial on application located in the Sh NW %. and [hc N'h SW'/., <br /> Gear Creek, and the tight to fill and held and decree Section 2, T3S, R7JW, bth P.M., Gilpin <br /> water diverted from refill continuously pending) County, Colorado, with the dam axis to <br /> North Clear Creek vl9 when in priority. intersect Chase Gulch at a point approzi- <br /> the Upper North Clear mately I,bDO feet from the Westsectian line <br /> Creek Pumping and 2,400 feet from the North section line <br /> Station and Pipeline at of said Section 2. The Upper North Clear <br /> 7,0 c.fs. filling rate Creek Pumping Station and Pipeline is <br /> locaud on the South bank of Nonh Clear <br /> Creek, in the NE'/ of the SW'/. of Section <br /> 34, Township 2 South, Range 73 Wcst of <br /> the 6a' P.M., Gilpin County, Colorado, at a <br /> point approximately 2,500 feet from the <br /> West section line and 1,900 feet from the <br /> South section line of said Section 34. <br />Hidden Valley Groundwater tributary LS c.fs., August 30, 1995 96CW463 SW%ofthe $Ey. of the NE'/. of Section 32, <br />Groundwater to Clear Cttek conditional January 20, 1999 T.3S., R. 72W. of the 6th P.M. et a point <br />Diversion Point 800 feet West of the East boundary of <br /> Section 32 and 2,030 feet South of the <br /> North boundary of Section 32, Clear Creek <br /> County. <br />Hidden Valley <br />~ Surface water from LS c.fs., August }D, 1995 96CW463 SW% of the SE'/. ofthe NE'/. of Seotion 32, <br />Surface Water Clear Creek conditional January 20, 1999 T.JS., R. 72W. oflhe 6th P.M.atelocation <br />Diversion Point 1000 feet West of the East boundary of <br /> Section 32 and 2,140 fact South of the <br /> North boundary of Section 32, Clear Creek <br /> County. <br />Slack Hawk Intake G Groundwater tributary 25 g.p.m., absolute April 1, 1996 94CW036 SW'/. SE'/. Section } 1, T.2 S, R. TJ. W., 6'" <br />Well to Four Mile Gulch, a (decreed herein) P.M., Gilpin County <br />Permit No, 055474-F Mbutflry to North <br /> Clear Creek <br />Black Hawk NorN Groundwater tributary 30 g.p.m., absolute April 1, 1996 94-CW-03b S W'/. SW%, Section 6, T. 3 S, R. 72 W., 6'" <br />Clear Creek Well to North Clear Crack, 10 g.p.m., (decreed herein) P.M., Gilpin County, <br />(Well Permit No. a tributary of Clear conditional I <br />51757•F) Crak - ' <br />As part of the water quality stipulation filed with the Court in this matter on January 31, 2000, set <br />forth in paragraph 35, below, the Black Hawk-Central City Sanitation District must design, construct <br />and begin operation by December 31, 2005 of a new wastewater treatment plant (the "New Plant") at <br />a location located downstream of the District's current plant on North Clear Creek. A well is <br />necessary io provide potable water service at the New Plant. The welt will require augmentation of <br />