Laserfiche WebLink
"Seam Longwall Subsidence Page 99~ August 17, 1998 <br />Table 10 (Cont). Cumulative maximum vertical subsidence for Panel #7, Panel #8, Panel #9 <br />and from crushing of chain pillars between Panels #7 and #8 and between Panels #8 and #9. <br />Subsidence Subsidence <br />Predicted Source <br />Overburden <br />2500-ft <br />Cover <br />Depth <br />Mining of <br />Panel #7 <br />Mining of <br />Panel #6 <br />Mining of <br />Panel #9 <br />Predicted Vertical Subsidence at Locations <br />Between Panel #9. Pillar Panel #8 Pillar Panel #7 <br />Panel #9 Center- Between Center- Between Center- <br />6 Panel Line Panels Line Panels Line <br />#10 9 & 8 #8 & #7 <br /> <br />0.02-ft 0.12-ft 0.32-ft 0.73-ft 1.93-ft 1.78-ft <br />0.22-ft 0.73-ft 1.93-ft 1.78-ft 1.93-ft 0.73-ft <br />1.25-ft 1.78-ft* 1.43-ft 0.73-ft 0.73-ft 0.12-ft <br />Pillar 0.00-ft 4.30-ft 9.30-ft 4.30-ft 4.30-ft 9.30-ft <br />Crushing <br />Predicted Totals 1.99-ft 6.93-ft 7.98-ft 7.59-ft 7.49-ft 6.93-ft <br />* - estimated without data on that panel side. <br />49 <br />