My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45211
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:36 PM
Creation date
11/20/2007 12:15:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
ROAD A LANDSLIDE REMEDIATION PLAN
From
Sedimentation Structure 006 Phase III (Design)
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4B & 13-4C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
below natural ground level. Excavated suitable material was used in embankment <br />construction. Excess material was wasted. The pond side elopes are 2h:Lv or flatter. <br />For Phase III, no further excavation of the pondinq area is necessary. <br />DESIGN ANALYSIS <br />General. Sediment Pond 006 vas redesigned to meet or exceed the design and performance <br />requirements of Colorado Mined Land Reclama tlon Division vhlle ut111z1 ng as much of the <br />existing topography as possible. Sediment Pond 006 vas designed to adhere to the <br />following specifications: <br />1. Provide storage and treatment for the runoff from the 10-year, 24-hour storm event <br />without experiencing any discharge through the emergency spillvay; <br />2. Provide an emergency spillvay capable of passing runoff from the 100-year, 24-hour <br />storm event; <br />3. Provide adequate storage for sediment generated as determined from the SEDCAD+ <br />conpu[er program. <br />Hyd rology. The hydrology of the watershed was analyzed utilizing the SEDCAD+ computer <br />program. SEDCADt Ss an enhanced PC version of the $EDIMOT II computer program. Tab 13, <br />Attachment 13-1, Addendum 1 contains a listing and description of the SEDCAD+ input <br />variables, In performing thla analysis, the characteristics of the mineslte and <br />reclamation procedures along with on-site sediment control procedures were considered. A <br />complete listing of the SEDCADi inputs and outputs for the 10-year, 25 year and the 100- <br />year design storms are provided Sn Attachment 13-4 C, Addendum 1. <br />TABLE 13-4C-1 <br />DESIGN HYDROLOGY AND SEDIMENTOLOGY SU)91SAY <br />POND 006 - PHASE III <br />Description <br />lOYr. -24Hr. 25Yr.-29Hc. 100Y c.-24Hr. <br />Precipitation Depth 1.7 in. <br />Inflov Runoff volume 12.69 ac-ft <br />Pond Yoluma at Peak Stage 17,47 ac-ft <br />Peak Stage 7070.7 <br />Peak Inflow Rate 99.24 cfs <br /> <br />• <br />2.1 Sn. 2.5 Sn. <br />20.90 ac-ft 30.86 ac-ft <br />21.61 ac-ft 22.89 ac-ft <br />7072.7 7073.3 <br />197.03 cfs 215.98 cfs <br />2 Revised 09/29/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.