Laserfiche WebLink
• <br />And estimated <br />Pc = 0.6 <br />Pm = 0.3 <br />Ps = 0.1 <br /> <br />Vs = 4.62 x 2,000 <br /> 5.30 <br />Then <br />(0.3) + 97 (0.1) = 55.3 lbs/ft3 <br />= 0.004 Ac-Ft <br />Yr. Ac <br />Vs = (3) (0.004) (2.4) = 0.03 Ac-Ft for 3 Yrs <br />Total Volume Req'd =Water + sediment <br />= 0.17 + 0.03 <br />= 0.20 Ac-Ft <br />Emergency Spillway: <br />Direct runoff 25 Yr = 1.11" <br />for 3$ slopes <br />Q 25 Y = (1.11) (4.5) (0.93) = 4.7 cfs <br />The sp~lway is sized to handle the peak flow = 4.70 <br />1 - 18" crop flowing full will carry = 5 cfs <br />1 - 18" crop for spillway <br />`J <br />Sanitary Landfill <br />Drainage = 4.9 Ac-Ft - Represents the landfill itself and the undiverted <br />natural area. All of the 4.9 acres are assumed to be disturbed with CN = <br />89. <br />Volume 10 Yr - (4.9) (0.86/12) = 0.35 Ac-Ft of water <br />Sediment Volume: <br />The same values are used as for the explosives storage area. <br />Vs = 0.004 Ac. Ft <br />Yr. Ac <br />for 4.9 Ac, Vs = (0.004) (3) (4.9) = 0.06 Ac. Ft. <br />Total Req'd Volume =Water + Sediment <br />= 0.35 + 0.06 = 0.41 Ac. Ft. <br />Emergency Spillway <br />Direct runoff 25 Yr = 1.11" <br />For 4$ slopes <br />Q = (1.11) (7.8) = 8.7 cfs <br />1 ?r'L4X'r0 crop flows 10 cfs when full <br />Use 1 - 24" crop <br />Sedimentation Pond By Office <br />The area drained into this pond is the shop area (12.7 ac) and the topsoil <br />stockpile "A" located southwest of the shop area (7.9 ac). <br />Total drainage = 20.6 ac <br />Volume 10 Yr = (20.6) (0.86/12) = 1.48 Ac. Ft. <br />U <br />