Laserfiche WebLink
Exhibit E . . <br />Reclamation Plan <br />The reclamation will consist of"~al grading to a slope conducive to overall <br />~, <br />drainage to point A, and topsoil fratq stockpiles or brought in (in the case' <br />;. <br />that not enough is available from the stockpiles) spread to a depth of at <br />least 1", The area will be seeded with a mixture of pasture grasses as <br />recommended by the soil conservation service, probably consisting of <br />brome, cYested wheat, and fescue. No water will be impounded at the site <br />for ponds. The reclamation work will be completed within 2 years of <br />cessation of mining, <br />., <br />