Laserfiche WebLink
J <br />' • • <br /> <br />Subtotals f0.00 50.00 50.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roedable Eqp. Description Cost/hr ~ (no. hauled) Cost/hr Cost/hr <br />_______________________________________________________________________________________________________ <br />_______________________________________________________________________________________________________ <br />_______________________________________________________________________________________________________ <br />_______________________________________________________________________________________________________ <br />Subtotals 50.00 f0.00 <br />EQUIPMENT. NAUL DISTANCE 8 TINE <br />______________________________ <br />______________________________ <br />Nearest major city or town within project area region: Las Animas, CO <br />Total one way [revel distance = 2.0 miles. Average travel speed = 25.00 inph. <br />Job Time - Mon Roedable Equip.= 0.50 hours load Roedable Equip.= ~N/A hours load <br />0.08 hours haul 0.08 hours haul <br />0.50 hours unload N/A hours unload <br />0.08 hours return 0.08 hours return <br />JOB COST Total Mob/Demob Cost = f515.58 <br />_________ _____________ <br />_________ _____________ <br />NOTE: Non-roadable equi Anent (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roedable equipment (no haul rig required) <br />costs based on one round trip. Co Lorado DOT requires special permits for oversize equi Anent on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for overstxe <br />equipment hauling, end loading/unLoadi ng times must be increased subatent Tally for equipment which oust be <br />partially dismantled for transport end re-asse~led et the job site. Costs for lifting equipment end other <br />support equi Anent needed for this work shou Ld be included in the mob/demob costs. <br />ROADABLE EQUIPMENT: sheet 2 of 2 <br />------------------ Total Eqp. Fleet Size Xeul trip Return Trip <br />Machine Destri ption <br />_______________________________ Cost/hr <br />___________________________ (no. hauled) <br />____________________ Cost/hr <br />____________ Cost/hr <br />_____________ <br />MOB/DEM08 SUPPORT EQUIPMENT: <br />Subtotals f0.00 50.00 <br />--------------------------- Yeight Ownership Xeul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-ROadable Eqp. Description (tons) Cost/hr Cost/hr (ra. hauled) Cost/hr Cost/hr Lost/ea <br />