Laserfiche WebLink
5-05-1995 9:d2AM FROM P~KCOUNTYROADBRIDGE 719 836 d27~ <br />1 ~ <br />PARK COUNTY <br />ROAD AND BRIDGE DEPT. <br />P.O. Box 147 <br />FAIRPLAY, COLO.80440 <br />719-836-2771 • 303-B38-7509 • 719-689-2555 <br />Adequacy Review <br />III IIIIIIIIIIIIIIII <br />999 <br />1) Our operation will not be close enough to effect any part of the <br />fence_ To the beat of my knowledge the fence belongs to us, <br />therefore, any problem to the fence we would fix as we do not want <br />cattle near our operation. <br />2) Park County will push at least 6" of growth medium in a stock <br />pile, we will stock pile approx 8,000 cubic yards. Any top soil <br />that we receive from our road construction protects in the area <br />will be stocked piled as well. <br />3) The pit run is removed by a D-9 dozer, which is pushed to the <br />processing plant. A front end loader is used to load material on <br />trucks which haul material to different parts of the county, <br />4) See attached sheet, <br />5) No <br />6) Our maximum slopes will be no greater than 3;1. <br />Mr. Curtiss, if you have any other 's pit <br />please feel free to contact me a 9) 636-2771 ext 277 Alao <br />thank you very much for your assistance, coneicl-eoration and <br />patients. It has been greatly appreciated. <br />Resp~ec~tfu~l~ly~, <br />„~~,~'_.Ll !/G=am <br />Rick Peters <br />Assistant Coordinator <br />Park County Road and Bridge <br />This document has been added to the original application whi h is <br />located at the Park County Clear and Recorders office on r <br />1995. <br />Acknowledgement <br />~ Q~~ <br />Barbara J. sco <br />Park County Clerk and Recorder <br />