Laserfiche WebLink
ISECTION A - I SE _ \ \ / i / / \ \ \ \ \ DIVERSION DITCH <br />/■ � .. (� , , , � J� ,, � , � � I ! � -\ / / \ \ � _ - - � \ \ � \) HAUL ROAD <br />/ I ♦ / I ` - - - - . DIVERSION DITCH A. PERMANENT 4' TO 6' WIDE 2' TO 25' DEEP,, - \ \ y5a - 25' BENCH (IYP. FOR SW WALL) <br />UNDISTURBED AREA DIVERSION DITCH. WH�RE DITCH I5 NOT \ \ / / / \ I - - S` _ _ 50' FACE (TYP. FOR SW WALL) <br />EXCAVATED IN ROCK, LINE WITH 12" MEDI^ <br />DIAMETER RIPRAP <br />OVERALL SLOPE <br />I <br />\, <br />l I \ <br />■ \\ v` \ \ \ \ \ - BUILD WASTE ROCK, <br />\ \ PILE UPSLOPE INITIAL LOCATION FOR <br />�■ � 3 EXCESS CUT MATERIAL <br />FRO PRO AREA745 <br />` �0\ \ M PROCESSING \ <br />■ \\ \ 1 11 \ \ >�> I / \/ // SCALE AOU�E OFhCE <br />ACCESS ROAD <br />NOMINAL ELEVATION 7200 DIVERSION DITCH B <br />TYPICAL SECTION ACROSS PROCESSING PLANT AREA <br />NOT TO SCALE <br />?RY 48" mIAME 11ER CULVERT \ \ i RIPRAP LINED EMERGENCY SPILLWAY L (LENGTH) - <br />\ \ \ > OF <br />S C <br />■ - -�$ - ` \ } '' t \ \ \ \ \•. \ \ OPFS / % PRODUCT STOCKPILES <br />- < OCE55ING PLANT AND PRODU EC�ION B -2 <br />AND PROCESSING PLANT \ \ 1 (P) D (DEPTH) <br />1 ' \ \ \\ STOCKPILE AREA <br />■ UNDERDRAIN OF COARSE 6" MEDIAN " \ APPROX. 4 ACRES AT 7200 - T. ELEV. <br />REA EXCA <br />DIAMETER ROCK WITH LESS THAN IOX �' - \\ EXCAVATED AND EXCESS CUT MATERIAL PLACED IN <br />PASSING THE #200 SIEVE IN THALWEG l ��� y, TEMPORARY WASTE ROCK PILE) ^ - DIVERSION DITCH B PERMANENT 6' WIDE 3' DEEP <br />■ TO CONVEY SUBSURFACE FLOWS / GJ� \ \ UNDISTURBED AREA DIVERSION DITCH j EPHEMERAL CHANNEL <br />_ - STOCKPILED ROCK (TEMPORARY)- <br />AND WASTE ROCK (PERMANENT) _ \ <br />TO BE DUMPED AND MOVED FROM <br />■ HAUL ROAD BY DOZER OR LOADERS.. <br />I _ <br />400 <br />TEMPORARY SEDIMENT POND B <br />3 7375- <br />PRINCIPAL SPILLWAY (CONFIGURATION MAY VARY) <br />D (DEPTH) <br />W(WIDTH) <br />RIPRAP SPILLWAY <br />/1 , <br />0.8 <br />OVERALL SLOPE <br />SEDIMENT POND <br />DEPTH <br />WIDTH <br />A <br />2' <br />10' <br />B <br />2' <br />10' <br />C <br />3' <br />25' <br />TYPICAL SPILLWAY <br />AREA <br />NOTES: <br />1. POND CONFIGURATION MAY VARY AS MINING PROGRESSES, <br />2, CONSTRUCT PRINCIPAL SPILLWAY RISER PIPE OR OTHER <br />WATER QUALITY CONTROL OUTLET WITH ORIFICES TO <br />ALLOW WATER ABOVE SEDIMENT LEVEL TO DISCHARGE IN 72 <br />HOURS. <br />SEDIMENT POND <br />LENGTH <br />WIDTH <br />AVERAGE DEPTH <br />*VOLUME <br />"'EMERGENCY <br />SPILLWAY FLOW <br />A <br />55' <br />30' <br />8.0' <br />13,100 FT <br />2.2 CFS <br />B <br />65' <br />65' <br />85 <br />54,900 FT <br />15.6 CFS <br />C <br />100' <br />130' <br />17' <br />193,000 FT <br />59.5 CPS <br />I \ CAPACITY R,20GET - - - _ _ - 3 \ \ t \ \ \ RIPRAP PAD AT TOE * 10 -YEAR / 24 -HOUR RUNOFF <br />- - _ = , �ON 7-350 \ \ \ \ \\ \\ \\ \ \ OF SPILLWAY " 10 -YEAR / 24 -HOUR RUNOFF (TEMPORARY) <br />■ \ \ \ \ \ \ \ \ \ \\\ _ - , ; . 5� 3 \ \ \ \ `\ \\ \ \\ 1} PRELIMINARY SEDIMENT POND PROFILES <br />OVERALL SLOPES IN THIS <br />\ \ \ AREA NO GREATER THAN 1.25VIH <br />1' HIGH, 3' WIDE BERM5 TO PREVENT PIT FLOOR RUNOFF FROM ENTERING DIVERSION <br />AREA OF DISTURBANCE \ g <br />F'OR PROCESSING PLANT \ TEMPORARY 48" DIAMETER CULVER \ \ \ \ V MIN. FREEBOARD <br />AREA-CONSTRUCTION ) O� \ I \ \ <br />0 MEN= <br />•',',,, '. I AIN ACCESS R6 EXISTING .3 M RIPRA" Afl V�HERE DIVERSION <br />\ <br />dbl\NS CHANNEL B <br />INTERNAL HAUL ROAD TO i \\ / \' <br />- -- D}Ht7 -- FiU - _ O TEMPORARY WAS rt CK YH- i �/ > <br />STQRAGE AREA ` \ \ \ \\ \ - - - - - - - - - 1' MIN. FREEBOARD - <br />_ ----------------------------- '� _ TEMPORARb SE`DIMENTPOND C P� \ 1 \ \ Sg \ _ - - - - - - - - - - - - <br />- CAP CI 220,000 FT3 \ \ \ \ H <br />- - - -' d <br />-- - - ---- - - __r i - -_ ( SPILLWAY VATION < 10' ... \ I \ \ cz� 1 \ <br />- --- <br />SF�R M STREAM BED) y \ J \ \ \ \ \ \ \ <br />LEGEND v a \ \ <br />PERMIT BOUNDARY 3`. <br />o' / �� v v v B <br />�•� � ' _- -\ �� `� - __ � / � <br />MINING LIMITS ` S- \` q3� �� <br />RIGHT OF WAY S OtiL SF <br />PAVED ROAD <br />-------------------------- - -- UNPAVED ROAD <br />_...- ...- ...- .- . -...- DITCH /WATERWAY -...` 1 \ \ \\\ �\ <br />NOTES: <br />} - - - - - - DIVERSION DITCH 1. PROCE55ING PLANT AREA AND INTERNAL HAUL ROAD WILL BE CONSTRUCTED AT THE SAME <br />> FLOW DIRECTION \ \ �`� \ ` - - TIME AS THE MAIN ACCESS ROAD. A 3' MINIMUM HEIGHT (OR AS REQUIRED BY EQUIPMENT) <br />S - BERM WILL BE CONSTRUCTED ON THE EDGE OF ALL ROADS WHERE IT I5 POSSIBLE FOR TRUCKS <br />EXISTING INDEX CONTOUR \ \ _ -11 TO RUN OVER EDGE. <br />\ \ \ 2. WASTE ROCK WILL BE MOVED BACK TO PLANT AREA FOR PROCESSING AFTER PLANT IS <br />x <br />EXISTING INTERMEDIATE CONTOUR <br />CC \ } \ \ CONSTRUCTED. <br />PROPOSED INDEX CONTOUR <br />\ _ 3. APPROXIMATELY 826,000 CU. YD. OF MATERIAL WILL BE EXCAVATED FROM PROCESSING PLANT <br />EXISTING 6'X8' CONCRETE \' \ \�� r\ - \\ \\ \ AREA AND HAUL ROAD CONSTRUCTION. <br />PROPOSED INTERMEDIATE CONTOUR BOX CULVERT - \ �- \ \ <br />� \ \� _ �� \ 4. WASTE ROCK PILE FOOTPRINT WILL BE STRIPPED OF SOIL, VEGETATION AND SNOW OR ICE <br />DOWN TO STABLE BEDROCK PRIOR TO PLACING WASTE ROCK. THE USEABLE SOIL WILL BE <br />EXISTING STRUCTURE GRAPHIC SCALE /� \ \ \ \ \ \ "� \ I I I\ \ \ qy ` \ ` STOCKPILED FOR USE IN REVEGETATION. A GEOTECHNICAL INVESTIGATION WILL BE <br />\ \ \ '�\ COMPLETED BEFORE WASTE ROCK PLACEMENT TO DETERMINE SLOPE STABILITY. BEMICHING OF <br />ioo <br />IF IF IF IF IF SILT FENCE o so w THE SUBGRADE WILL BE COMPLETED IF REQUIRED FOR WASTE ROCK PILE STABILITIY. <br />\ \ \ I I S <br />STREETLIGHT Permit #: / - Confidental ?: <br />(IN PROXIMITY TO AFFECTED LAND) \ \ \ I \ \ \ s: Clas <br />( IN FEET) \ \ \ \ \ Type-Seq.: <br />OHU OHU OVERHEAD UTILITY 1 inch = 100 ft \ - - \ \ \ \ S \ _ _ _ From: $ To: <br />\ '.\ .\ \ � \ _ _ Doc. Name: <br />CONTOUR INTERVAL = 5' Doc. Date (if no date stamp): <br />5 5 SEWER LINE (UNDER CONSTRUCTION) \ \ \ \ \ \ Specialist: T5- <br />(FINAL DESIGN AS REQUIRED BY CDPS PERMIT) <br />NOT TO SCALE <br />DITCH B CROSS SECTION <br />ADJUST ALIGNMENT AND /OR <br />HEIGHT (H) 50 THE DEPTH (d) <br />FLOWS IN COMPETENT ROCK <br />DITCH A CROSS SECTION <br />CHANNEL <br />SECTION <br />B <br />(ft) <br />H <br />(ft) <br />SLOPE <br />(ft /ft) <br />CAPACITY <br />(ft') <br />d <br />(ft) <br />V <br />(fps) <br />B -1 <br />6.0 <br />3.0 <br />0.0702 <br />218 <br />1 2.0 <br />12.1 <br />B -2 <br />6.0 <br />3.0 <br />1.78 <br />WATER FALL EFFECT <br />B -3 <br />6.0 <br />3.0 <br />0.0192 <br />114 <br />1 2.0 <br />1 6.33 <br />8-4 <br />6.0 <br />3.0 <br />0.200 <br />368 1 <br />2.0 <br />1 20.4 <br />CHANNEL <br />SECTION <br />B <br />(ft) <br />H <br />(ft) <br />SLOPE <br />(ft /ft) <br />CAPACITY <br />(ft3) <br />d <br />(ft) <br />V <br />(fps) <br />A -1 <br />1 4.0 <br />2.0 <br />1 0.0581 <br />39.7 <br />1.0 <br />7.2 <br />A -2 <br />1 4.0 <br />2.0 <br />1 0.438 <br />109 <br />1.0 <br />19.8 <br />A -3 <br />6.0 <br />2.5 <br />0.0266 <br />79.2 <br />1.5 <br />6.4 <br />A-4 <br />6.0 <br />2.0 <br />0.413 <br />152 <br />1.0 <br />20.2 <br />A-5 <br />6.0 <br />2.0 <br />0.143 <br />1 91.5 <br />1.0 1 <br />12.2 <br />A -6 <br />1.0 <br />25.0 <br />0.198 <br />1 94.8 <br />1.0 1 <br />12.6 <br />TYPICAL DIVERSION DITCHES <br />NO SCALE <br />NOTES: <br />1. BASE WIDTH AND CHANNEL HEIGHT ARE MINIMUM VALUES. <br />2. SIDE SLOPES 1.5:1 MAXIMUM. <br />3. CUT CHANNEL DEEPER IF REQUIRED TO REACH COMPETENT ROCK <br />4. WHERE DITCH IS NOT LOCATED ON COMPETENT ROCK, OVER EXCAVATE AND PLACE FILTER <br />FABRIC, IF REQUIRED, AND PLACE 24" THICKNESS OF 12" MEDIAN DIAMETER RIPRAP ON DITCH <br />BOTTOM AND SIDES. <br />PREPARED UNDER THE SUPERVISION OF: <br />5. SEDIMENT POND C SHOWN IS MAXIMUM SIZE REQUIRED AT THE COMPLETION OF THE 10 -YR <br />QUARRY. THE QUARRY OPERATOR MAY CONSTRUCT AN INTERIM SMALLER POND AT THIS <br />LOCATION OR OTHER LOCATIONS ON THE PIT FLOOR TO BE INCREASED IN VOLUME AS MINING <br />PROGRESSES. <br />6. SEDIMENT PONDS WILL BE INSPECTED FOLLOWING SIGNIFICANT RUNOFF EVENT AND NAME DATE <br />SEDIMENT REMOVED IF NECESSARY. RECEIVED <br />OCT 2 4 2005 <br />TITLE <br />Division ■t Minerals and Geolo9Y <br />REVISED EXHIBIT C -213: CONSTRUCTION OF PROCESSING PLANT AREA <br />::BANKS AND GESSO, LLC CLEAR CREEK DISTRICT WATER PROVIDERS, LLC. MMRR QUARRY <br />720 KIPLING St., SUITE 117 DMG REGULAR 112 PERMIT APPLICATION <br />LAKEWOOO, COLORADO 80215 5460 SOUTH QUEBEC ST. SUITE 110 GILPIN COUNTY <br />(303) 274 -4277 GREENWOOD VILLAGE, CO 80111 COLORADO <br />JOB NO DATE SCALE Fl) AWN BY DESIGNED BY APPROVAL REV SHEET <br />03047 9/23/05 1" =100' RF 3of5 <br />