Laserfiche WebLink
<br /> <br />Mr. Scott Briggs <br />February 18, 1980 <br />Page -5- <br />2) Mining timetable based on population <br />projections; <br />3) Reclamation timetable; <br />4) P1ethod of planting trees and shrubs. <br />We realize this is a long list of questions, most of which have been asked <br />before,but we believe they are necessary to provide adequate information <br />prior to presentation to the Board. <br />Please contact the Division if there are any questions. <br />Sincerely, /~ ~ ~eG~%~-f% <br />~a~ sl~c-l~s-z. ~~G~s..~ <br />Dave C. Shelton <br />Geotechnical Reclamation Supervisor <br />DCS:JM:JS:ys <br />