Laserfiche WebLink
LOVELAND READY MIX <br />/~ (~ / ~J / - t ; ; - // <br />LOV"ELCLl2d CJ\ECL[ta~ ~LX '~012C*C~~Sy.~J12C. <br />-_ .'-CONCRETE SAND, &.GRkVEL , <br />Phone(970)~667=2680-. ~ ~•~ Fex"(970)667-0036 <br />p bt Boz 299 ~=_ Loveland, CDlorgdo 8b689•b289 ,:` ' <br />March 5, 2007 <br />Mr. Tom Schreiner <br />Division of Reclamation, Mining, and Safety <br />Department of Natural Resowces <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />RE: 2"a Adequacy Review Comments for "Bokelman-Walters", Regular 112 Application <br />Class: Permit File No. M-2006-080 <br />Dear Mr. Schreiner: <br />This letter addresses the two review comments in yow letter dated March 1, 2007. <br />6.4.12 EXHIBIT L -Reclamation Costs <br />PAGE 02 <br />Loveland Ready Mix Concrete, Ina (LRM) realizes that in order to qualify for the 20% bonding <br />option for the slurry wall construction, LRM must commit to the following: <br />I. Submit a copy of the slurry wall installation QaQc procedwes to be followed during <br />slurry wall construction. <br />2. Submit a final construction report with details of the slurry wall installation effort, <br />geologic conditions encountered, and any specific design modifications performed during <br />construction do to unforeseen field conditions. <br />3. Submit Certification from a registered professional engineer that the slurry wall has been <br />installed according to the design sp~ifications and QaQc procedwes, and that the slurry <br />wall will function up to the leakage criteria of the State Engineer's Office for a water <br />storage facility. <br />LRM commits to providing all of the above, and will submit this information in the form of a <br />technical revision to the permit prior to exposure of groundwater at this site. <br />Page 1 of 2 <br />