My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45071
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:29 PM
Creation date
11/20/2007 12:11:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006A
IBM Index Class Name
Permit File
Doc Date
9/26/2007
Section_Exhibit Name
Part 780 Reclamation and Operations Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Section 780.14{b) Continued. <br /> Tipple Area Existing Structures. New facilities are shown on Map 1, <br /> Kerr Mine Area Mine Plan and Map 29, Kerr Tipple Area Existing <br /> Structures. No specifically defined utility corridors (rights-of- <br /> way) were necessary for installation of the utilities as shown on Map <br /> 28a, Kerr Mine Area Existing Structures, and Map 29, Kerr Tipple Area <br /> Existing Structures, with the exception of the telephone lines within <br /> Section 26, T9N, R78W. The utility corridor for this line is defined <br /> on Map 28a. The only easement which has been granted to Kerr Coal is <br /> that for the access road to the Kerr Tipple Area. This easement is <br /> shown on Map 2a, Kerr Mine and Tipple Area Surface Ownership. A <br /> discussion of how the requirements imposed on Jackson County in <br /> connection with the re-routing of County Road 12E and the eventual <br /> reclamation of "old" roads will be accomplished is provided in <br /> Section 780.18 of this application. No requirements regarding <br /> reclamation of telephone lines have been imposed by BLM. <br /> (2) The area of land to be affected within the proposed mine plan area, <br /> according to the sequence of mining and reclamation; <br />The area of land to be affected within the proposed Mine Plan Area, <br />according to the sequence of mining and reclamation, is shown on Map <br />1, Kerr Mine Area Plan; Map 29, Kerr Tipple Area Existing Structures; <br />Map 31a, Kerr Mine Area Soil Removal and Storage, Soil Replacement <br />and Revegetation; and Map 33, Kerr Mine Area Overburden Replacement <br />and Grading. These maps all include the Kerr north area which will <br />not be mined under currently permitted plans. Any future mining <br />activities in the north area will be separately permitted and <br />approved as a revision to the existing permit. <br />(3) Each area of land for which a performance bond or other equivalent <br />guarantee will be posted under Subchapter J of this Chapter; <br /> <br />780-30aaR Revised - August, 1990 <br />.v -r. ~~_ -~_ - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.