<br />Revised 04/20/90 <br />Section 780.11(a) Continued. <br />After the coal has been prepared for loading, it will be loaded onto <br />25 ton rear-dump Kenworth tractor-trailer highway haulers utilizing <br />either of the following loading units: <br />Caterpillar 988 Front-end Loader 8 yd. bucket <br />Caterpillar 245 Backhoe 2 1/2 yd. bucket <br />The coal haulage trucks will transport the coal along professionally <br />designed and maintained haul roads to Jackson County Road 12E and an <br />additional 10 miles on County Road 12E to the Kerr Tipple Area. The <br />fleet of coal haulage trucks utilized consists of eight 25 ton rear- <br />dump Kenworth tractor-trailer highway haulers. <br />The anticipated annual and total tonnage production of coal, listed <br />by the mining pit number, and in total, is shown in Table 53, <br />Anticipated Annual and Total Coal Production. <br />Coal from the Permit Area will be transported to the Kerr Tipple Area <br />where it will be stockpiled until crushed and loaded into railroad <br />cars for shipment. No cleaning of the coal is required, and <br />consequently, Kerr Coal will not produce any coal processing waste, <br />as further discussed under Sections 816.81-816.88. In addition, <br />because the proposed mine plan does not call for any significant <br />increase in present coal production, no new loadout facilities will <br />be constructed. Additional information on the mine facilities is <br />included in Sections 816.180, 816.181, 780.12, and on Map 28a, Kerr <br />Mine Area Existing Structures. Upon cessation of the operations all <br />support facilities and utility installations will be removed and the <br />t <br />sites graded and revegetated. The complete coal handling and <br />crushing flow diagrams for the Kerr Tipple are shown on Figure 12, <br />Kerr Tipple Layout and Figure 13, Kerr Tipple Crushing Facilities. <br />I <br />780-5 as <br />- - - -- <br />