Laserfiche WebLink
<br />~. <br />• b. The snnual consumption 1n winter <br />months from the operation of this Plan rill be 4.52 ecre- <br />feet which rill be replaced when required by releases from <br />the Snormass Coal Reservoir. <br />10. The Applicant proposes that during the summer <br />months of each year then the Augmentation Plan is in opera- <br />tion and out of prlortty diversions are occurring, the <br />ADDlicant will be obligated to forego the diversion and use <br />of sufficient rater from the Crane and Pebbles Ditch to <br />augment the river to the full amount of the ,c onsumptlon <br />resulting from Its loadout operations; such augmentation <br />requirement rill not exceed a total of 20 scre-feet <br />annually. The Applicant may elect to forego diversions 1n <br />the Crane and Pebbles Ditch of 0.026 cfs (12 gpm) over the <br />entire summer fn fulfillment of this requirement. <br /> 11. The APplicant proposes that during rioter <br />• months rh en this Ptan is 1n operation and ouL-of-prlortty <br /> diversions are occurring, the Applicant rill be obligated to <br />provide augmentation rater to the river from. the Snormass <br />Coal Re servolr to the full amount of the consumption result- <br />ing from its loadout operations. The augmentation that can <br />be required of the Applicant cannot exceed 4.52 acre-feet 1n <br />any annual winter period. <br />12. The Appttcent's Droposal results fn the eug- <br />mentation of the river by seven (1) acre-feet annually over <br />the Applicant's to tat consumption. This amount shall be <br />dedicated to the Applicant for the benefit end protection of <br />the river end as such is considered as being beneficially <br />used and noL absndoned end said seven (7) acre-feet may be <br />ut111xed for further or additional uses Dy the AppllcenL, <br />including augmentation, upon proper application to the <br />Court. <br />• <br />a <br />