Laserfiche WebLink
PART I <br />Page 8 <br />Permit No. COG-850000 <br />• B. EFFZDENT LIMITATIONS AND MONITORING REQUIREMENTS <br />3) Storawater Quality Controls <br />Each mining site covered by this permit shall develop a <br />description of stormwater quality controls appropriate for that <br />site, and implement ouch controls. The appropriateness and <br />prioritise of controls in the plan shall reflect identified <br />potential sources of pollutaats at the ^its. The description of <br />stormwater quality controls shall address the lollowinq m+^~*~~ <br />coaq~onenta, including • schedule for implementing each coatrols~ <br />a. SWItP Administrator - Tha SW!@ shall identify a apscilic <br />individual or individuals withia the mining organization who <br />i^ responsible for developiag the BWlD? sad assisting the <br />mine operator in its implementation, maintenance, and <br />revision. <br />b. t~ateriale Handlinc and Soill Prevention - Where material• <br />can impact atormwater runoff, BMPe~that reduce the potential <br />for contamination shall be described. For example, <br />materials should be stored and handled in covered area^ <br />whenever possible to prevent contact with stormwater; fuels <br />and other chemicals should be stored within berms or <br />secondary containment devices to prevent leaks and spills <br />• from entering stormwater runoff. <br />c. Erosion and Sediment Controls - Describe BMPe that will be <br />used to reduce erosion and prevent sediment delivery to <br />State waters. These should include structural (such as •ilt <br />fences, sediment ponds, drop structures, check dame) and <br />non-structural (such ae mulching and revegetation) methods. <br />Whenever a facility or a portion of a facility enters the <br />Host-mining phase, it is likely that the overall <br />configuration of the site will change considerably. Prior <br />to the time when new vegetation becomes established, the <br />surface areas will be subject to potentially significant <br />erosion. The permittee will need to take adequate measures <br />in order to minimize this erosion as well ae the erosion <br />normally encountered during mining activities. <br />d. Testing/Evaluation for Non-Stormwater - The Stormwater <br />Quality Controls section of the SWMP shall include <br />documentation that the discharges have been evaluated or <br />tested for the presence of non-stormwater discharges ouch as <br />mine drainage, spoil springs, sanitary waste, or process <br />water of any kind. The documentation shall include a <br />description of the results of any test or evaluation method <br />for the presence of non-etarmwater discharges, the method <br />used, the date of any testing, and the on-site drainage <br />• points that were directly observed during the teat. <br />Amended I(1/1?/94 Effectiv6 ti/I?/Q4 <br />