My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45039
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:28 PM
Creation date
11/20/2007 12:09:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981024
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 7 NPDES PERMIT INFORMATION PART 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART Z <br />Page 6 <br />Permit No. COG-850000 <br />• <br />B. EFFLIIENT LIMZTATIONS AND lSONITORING REQDIREI~NTS <br />1. Effluent Limitations (continued) <br />d) Burden o! Proof Requirement <br />The permittee has the burden of proof when requesting relic! from <br />total suepeaded solids (TSS), total iron and/or settleable solids <br />limitations.-'Relief shall be granted only when necessary and shall <br />not be granted whoa the parmittee has control over the discharge. <br />The permittea should endeavor to meet the primary limitations <br />whenever possible. <br />1) For rainfall, to waive TSS and total iron limitations, it is <br />necessary to prove that discharge occurred within 48 hours after <br />measurable precipitation hoe stopped. In addition, to waive <br />settleable solids limitations, it is necessary to prove that <br />discharge occurred within 48 hours after precipitation greater <br />than the 10-year, 24-hour event has stopped. <br />• <br />2) For enowmelt, to waive TSS and total iron limitations, it ie <br />necessary to prove that discharge occurred within 48 hours after <br />pond inflow hoe stopped. In addition, to waive settleable solids <br />limitations, it is necessary to prove that discharge occurred <br />within 48 hours after pond inflow volume greater than the 10-year, <br />24-hour event has stopped. <br />The Division shall determine the adequacy of proof. Aa part.of this <br />determination, the Division shall evaluate whether the permittae <br />could have controlled the discharge in such a manner that primary <br />limitations scold have been met. All manual dewaterinq must meet TSS <br />and total iron limitations. <br />2. Stormwater Management Plan (SNMP1 <br />A Stormwater Management Plan (SWlSP) shall be developed for the portion <br />of each facility covered by this section of the permit. The SWliP shall <br />be prepared in accordance with good engineering practices. (The plan <br />need not be completed by a registered engineer.) <br />The plan shall identify potential sources of pollution (including <br />sediment) which may reasonably be expected to affect the quality of <br />atormwater diachargea associated with the mining operation. In <br />addition, the plan shall describe and ensure the implementation of beat <br />management practices (Blips) which will be used to reduce the pollutants <br />in etormwater diachargea associated with mining activity. <br />Mining operations must implement the provicioas of the SwMP required <br />under this part as a condition of this permit. The Division reserves <br />• the right to request and review the plans, and to require additional <br />measures to prevent and control pollution, as needed. <br />Amended 10/13/94 Effective ii ~iv~,oi. <br />
The URL can be used to link to this page
Your browser does not support the video tag.