Laserfiche WebLink
i ~= <br />°^l~ l OF COLORP~DO <br />III IIIIIIIIIIIII111 <br />OFFICE OF THE STATE ENGINEER 999 <br />Division of Water Resources e~oF to~O> <br />Department of Natural Resources RECEIVED ~" o~ <br />1713 Sherman Street, Room 818 ~~' ."',~ <br />Denver, Colorado 80203 MAY p 3 2001 ~ ta,b' <br />Phone: 13031 86b-3581 <br />F.4x: (3031866-3589 Bill Owens <br />Division of Minerals end Geology co.erno, <br />hnp!/v<alerstale co.us/defaulLhim <br />Gres E. Walther <br />E>.ecuYve Dneaor <br />Response to Reclamation Permit Application Consideration Ha. D. s meson, P.E. <br />DATE: May 2, 2001 State Engineer <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 6 Office, Distric/~t 57 Water Commissioner <br />FROM: Jeff Deatherage, P.E. ~yD <br />RE: Camilletti Milner #2 Pit, File No. M-2001-023 <br />Operator: Camilletti and Sons, Inc., <br />Contact: David Zehner, 970.276.3359 <br />Section 15, Twp 6 North, Rng 86 West, 6th P.M., Routt County <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^reclamation, <br />® water removed in the mined product, ®processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable (see additional comments below). <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />® In the event that ground water is encountered/used, water is currently available for appropriation at this <br />location, thus a well permit may be available without a water court approved plan for augmentation. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for uses at the permit site. Applicant needs <br />to document that the water is obtained from a legal source for such industrial use. <br />® Applicant has obtained well permit no. 55157-F for the subject gravel pit. Applicant must maintain a <br />valid well permit and operate the gravel pit pursuant to the terms and conditions of permit no. 55157-F. <br />COMMENTS: Pursuant to Policy 2000-4 of the State Board of Examiners of Water Well Construction and Pump <br />Installation Contractors (Board), no pumping equipment shall be installed in the gravel pit well to <br />withdraw water for any beneficial use, unless a separate written request for variance has been approved <br />by the Board. <br />The applicant may contact the State Engineer's Office with any questions. <br />