My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE45008
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE45008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:26 PM
Creation date
11/20/2007 12:08:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
6/17/2005
Doc Name
1/13/2005 Geotechnical Engineering Study, Lambert & Assoc, (Gob Pile)
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M04007MT <br />the proposed site development and scope of services as provided to <br />us by Mr. Collin Stewart, Mr. Jim Stover, P.E., J. E. Stover and <br />Associates, on the type of construction planned, existing site <br />conditions at the time of the field study, and on our findings. <br />Should the planned, proposed use of the site be altered, Lambert <br />and Associates must be contacted, since any such changes may make <br />our suggestions and recommendations inappropriate. This report <br />should be used ONLY for the planned development for which this <br />report was tailored and prepared, and ONLY to meet information <br />needs of the owner and the owner's representatives. In the event <br />that any changes in the future design or location of the building <br />are planned, the conclusions and recommendations contained in this <br />report shall not be considered valid unless the changes are <br />reviewed and conclusions of this report are modified or verified in <br />writing. It is recommended that the geotechnical engineer be <br />provided the opportunity for a general review of the final project <br />design and specifications in order that the earthwork and <br />foundation recommendations may be properly interpreted and <br />implemented in the design and specifications. <br />^ This report does not provide earthwork specifications. We can <br />provide guidelines for your use in preparing project specific <br />' earthwork specifications. Please contact us if you need these for <br />your project. <br />' This report presents both suggestions and recommendations. The <br />suggestions are presented so that the owner and the owner's <br />representatives may compare the cost to the potential risk or <br />benefit for the suggested procedures. <br />This report contains suggestions and recommendations which are <br />intended to work in concert with recommendations provided by the <br />other design team members to provide somewhat predictable founda- <br />tion performance. If any of the recommendations are not included <br />in the design and construction of the project it may result in <br />unpredictable foundation performance or performance different than <br />anticipated. We recommend that we be requested to provide geotech- <br />nical engineering observation and materials testing during the <br />construction phase of the project as discussed in this report. The <br />purpose for on site observation and testing by us during construc- <br />tion is to help provide continuity of service from the planning of <br />the project through the construction of the project. This service <br />9 <br />jiLambert anD ~,~,s'oriates <br />CONSULTING OEOTECNNICAL ENGINEERS AND <br />MATERIAL TESTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.