Laserfiche WebLink
SEDCAD 4 for Windows <br />r~..~,d..m i°°v oo,..d~ i c~~...,~n <br />Pond Results: <br />Peak Elevation: 7,015.71 <br />H'graph Detention Time: 11.91 hrs <br />Pond Model: CSTRS <br />Dewater Time: 1.07 days <br />Trap Efficiency: 99.46 <br />Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br /> <br /> <br />Detailed Discharge Table <br />*Designates time(s) to dewater have been extrapo/ated beyond the SO hour hydrograph limit. <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-~) Discharge <br /> <br />(~) Dewater <br />Time <br />(hrs) <br />7,010.29 0.425 0.000 0.000 Top of Sed. Storage <br />7,010.50 0.496 0.096 0.000 <br />7,011.00 0.696 0.393 0.000 <br />7,011.50 0.898 0.791 0.000 <br />7,012.00 1.124 1.296 0.000 <br />7,012.50 1.357 1.915 0.000 <br />7,013.00 1.612 2.657 0.000 <br />7,013.50 1.690 3.482 0.000 <br />7,014.00 1.770 4.347 0.000 <br />7,014.50 1.829 5.247 0.000 <br />7,015.00 1.889 6.176 0.000 <br />7,015.30 1.928 6.748 0.000 Spillway #2 <br />7,015.50 1.954 7.137 0.352 13.37* <br />7,015.71 1.982 7.560 0.489 12.35 Peak Stage <br />7,016.00 2.019 8.130 0.675 <br />7,016.50 2.075 9.153 1.114 <br />7,016.80 2.109 9.781 1.249 <br />7,016.90 2.IZI 9.992 1.293 Spillway #1 <br />7,017.00 2.132 10.205 4.590 <br />7,017.50 2.186 11.285 21.055 <br />7,018.00 2.241 12.392 60.922 <br />7,018.50 2.301 13.527 118.839 <br />7,019.00 2.362 14.693 195.367 <br />7,019.50 2.570 15.925 288.674 <br />7,020.00 2.787 17.264 398.947 <br />Filename: P008 As-Built.sc4 7-6f . 3-15 Printed 09-26-2005 <br />