Laserfiche WebLink
<br /> <br />MINING PLAN <br />E}GIIBIT B <br />aarxrr.~:v (~~, pIT (110) <br />Sec. 15, T. 40 N., R. 19 W., N.M.p.M. <br />Top soil will be stripped and dozed into a stockpile at the west <br />boundary of the south half of the permitted area. The remaining soil <br />overburden will be dozed west to a stockpile along side of the top soil <br />stockpile and between it and the excavation area. Sandstone material will <br />be ripped up and fed to the crusher hopper located on the floor of the <br />existing pit area in the north portion of the permitted area. FSccavation <br />will proceed south from the existing pit at a depth which_will allow water <br />drainage into the County Road "L" culvert from the finished excavation area. <br />Finished sideslopes will be no steeper than 3-horizontal to 1-vertical. <br />Processed sandstone material will be stockpiled in the worked~ut existing <br />pit area until hauled away for construction. <br />