Laserfiche WebLink
TABLE OF CONTENTS <br /> (Continued) <br /> Page <br /> Bonding 13-50 <br /> Introduction 13-50 <br /> Reclamation Cost Categories 13-51 <br /> BackFilling and Grading 13-52 <br /> Topsoil Replacement 13-53 <br /> Revegetation 13-54 <br /> Facility Reclamation 13-54 <br /> Structure Demolition 13-54 <br /> Powerlines 13-S4a <br /> Facility Areas 13-54a <br /> Miscellaneous Utilities 13-S4a <br /> Sediment Ponds 13-54a <br /> Road Reclamation 13-S4a <br /> xaul Roads 13-55 <br /> Permanent Roads 13-55 <br /> Other Roads 13-55 <br /> Indirect Costs 13-55 <br /> Mobilization and Demobilization 13-55 <br /> Production Shifts 13-55 <br /> Equipment type 13-56 <br /> Reclamation Time Frame 13-56 <br /> Mobilization and Demobilization Costs 13-56 <br /> Engineering Redesign fee 13-56 <br /> Contractor Profit and Overhead 13-56 <br /> Reclamation Management Gee 13-57 <br /> Cos[ Summary 13-58 <br /> Direct Cos[ 13-58 <br /> Indirect Cost 13-59 <br /> Literature Cited and References 13-60 <br />• <br /> 13-iii Revised 04/15/94 <br />