Laserfiche WebLink
III IIIIII'IIIIII'II Doc Date:12/11/2001 <br />sss <br />. SECTION 6.0 Livestock Pond Construction Through 1989 and <br />Proposed Approximate Locations for 1990. <br />This correspondence is to update the CMLRD on the final locations of constructed <br />livestock ponds at Trapper Mine through 1989 and the approximate locations for <br />proposed pond constuction in 1990 (see attached map). The aversge pond density on <br />Trapper reclaim areas will not exceed one pond per ten acres og drainage area as <br />required in our hermit. The attached Table 1 describes as-built pond density in associ- <br />attonwith specific drainage areas. <br />The enclosed map also shows 43 additional ponds that may be constructed by Trapper to <br />accommodate the optimum density for livestock/wildlife use on the area. However in <br />1990, ten ponds are proposed for construction and will be completed by October 31st. <br />Table 2 describes the approximate drainage area per pond following 1990 construction. <br />As the case with all previous livestock/wildlife pond construction, future pond <br />construction will meet or exceed state and federal standards andlor specifications. All <br />constructed ponds have been inspected by the SCS and forwarded to the Divison via our <br />annual report. <br />WSH/jsb <br />• <br /> <br />