Laserfiche WebLink
~'~''`~ / C ~~`7 <br />Russell Ranch General Partnership ~ November 15, 2005 <br />Russell Ranch Pit ~ ~~ Amended March 21,2006 <br />~_,aoo6-oa8 ~ ~eCeived <br />Exhibit "C" ~ <br />MAR 2 fi 20R8 ~ <br />MINING PLAN fira~d Junction Fief :~ffise <br />Division of MinaP~': : :~w,9~Y <br />a) Mining operations will begin upon approval of permit, January 2006 +/- <br />and continuing until reserves are depleted 2025 +/-. <br />b) The pit site is expected to have 1' -1.5' topsoiUoverburden. <br />c) No waste overburden is expected out of stripping of topsoil. <br />d) Estimated 25' of pit run gravel to be mined at site. <br />e) Three major components of the operation will be to: <br />1. Strip Topsoil <br />2. Mine and process gravel on site. <br />3. Reclamation <br />f) Pit disturbed area to be approximately 750' x 500'. <br />g) Existing road to permit area to be upgraded for safe access to pit area. <br />h) No water is to be used in mine operation. <br />i) No ground water is expected to be encountered. <br />j) No contact with existing water rights is expected. <br />k) No refuse or toxic materials are expected in the mining or reclamation <br />phases. <br />1) No disturbance to hydraulic balances is expected to occur. <br />