Laserfiche WebLink
t <br />• • <br />STIPULATIONS TO PERMIT N0. M-86-104 <br />1. The operator shall submit to the Division plans for containment of all <br />hydrocarbons used, generated, and/or stored on-site. This plan must be <br />obtained from the Eagle County Health Department and the Mined Land <br />Reclamation Board prior to construction of containment facilities and <br />prior to the presence of hydrocarbons at the site. The plan shall <br />consist of two parts: <br />a. A plan for fuel storage, spill prevention, and spill <br />containment; and, <br />b. A plan for handling, storage, and disposal of all spent <br />petroleum products. <br />2. The operator shall submit to the Division plans for relocation of the <br />CKP ditch. Plans shall be consistent with the requirementsof <br />34-32-116(1)(h). These plans shall be approved by the Mined Land <br />Reclamation Board prior to the excavation of the existing ditch. <br />/tmb <br />5443E <br />