My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44895
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:47:19 PM
Creation date
11/20/2007 12:06:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Doc Name
for the West Flatiron Lease Area
Section_Exhibit Name
Exhibit 60C Subsidence Eval & 2004 Geologic Hazard Field Obsersvations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 <br />LJ <br />E#ribit 60C <br />Subsidence Evaluation and 2004 Geologic Hazard Field Observations <br />West Flatiron Lease Area <br />4.0 MINING METHOD <br />The longwall mining method will be utilized in the West Flatiron Lease area. An average of 12 <br />feet of coal is currently planned to be removed from the B Seam. The coal will be mined by the <br />retreat method-from east to west Longwall mining panels 18, 19, 20, and 21 are projected <br />from the Box Canyon mining area into the West Flatiron Lease area (Map 1). Projected longwall <br />panels 18 through 21, as currently planned, will be 970 feet wide (counting the headgate and <br />tailgate entries on either side nearest to the longwall panel block of coal). Longwall panels 18 <br />through 21, as currently projected, range from 5,850 to 8,200 feet long. Longwall panel 18A is <br />projected to be 660 feet wide and about 3,000 feet long. <br />The headgate entries of the longwall panels 18 through 21 each are planned as a row of rigid <br />pillars on 200-foot centers next to the panel, and a row of yield pillars 80 feet wide and 200 feet <br />long (Map I). The long axis of the longwall panels trend about N80°E. The mine plan may be <br />• subject to change, based on such aspects as coal quality and thiclmess, geology, and topography. <br /> <br />831-032.650 Wright Wafer Engineers, InG Page 5 <br />November 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.