Laserfiche WebLink
Initial quarrying will include~T,gG$p~ling the existing <br />topsoil in the area designated as the topsoil/product storage area <br />immediately northwest of the exposed gypsum. <br />Attachment I is an estimate of the gypsum bed thickness <br />and the included tonnage. <br />• <br />~~ <br />L <br />• <br />• <br />