Laserfiche WebLink
Exhibit E: Reclamation Plan <br />Reclamation Plan <br />~Zq,.Reclamation will be c ying. Dper- <br />`~,~ gsg, Contouring or re-vegeri' ~l-i11 begin unti~,~ <br />the qudrry is d2',~~3~d. The mining will progress with the re- <br />lamation plan as the criteria. The entire permit area is re- <br />~~,~ e <br />• quired for current operation. Only the required area will be <br />disturbed and then only as needed. <br />The top soil occurs in limited quantities and will be <br />stockpiled to be used in the final reclamation as needed. The <br />depth of top soil will range from 6" to 12"~ The area will be <br />reseeded according to S.C.S. recommendations to promote the use <br />by wildlife. <br />Re-vegetation will be consistent with the casual use of <br />the adjacent areas. <br />The libel gradir~ will be done so that the clopt•toill' <br />not exceed that'b'f the area as it exists today. This slope vu -, <br />ies from 2:1 to 4::L. quarrying operations will be conducted to <br />promote final recl~~mation. <br />The quarry plan is a multi-bench with safety berms <br />which will allow a final (1:1 *0 2:~1 slope which is consistent <br />• with the undistxubead hillside above the quarry. Weathering will <br />occur over the li~a~~,e,~d„~?hi~h w~ll~ allow the up~er d <br />benches again t9 blend in with the upper undisturbed area. <br />• <br />• <br />