Laserfiche WebLink
a~ <br />TABLE OF CONTENTS <br /> <br />4.0 OPERATION AND RECLAMATION PI,.1N5 1 <br />4.1 Objectives and Background 1 <br />4.2 General Operation Plan - Life of Operations 2 <br />4.2.1 Production Methods and Equipment 3 <br />4.2.1.1 Production Methods 3 <br />4.2.1.2 Equipment 5 <br />4.2.1.2.1 Hy~9raulic Monitor 5 <br />4.2.1.2.2 Feeder-Breaker 6 <br />4.2.1.2.3 Development Machines 6 <br />4.2.1.2.4 Ma~.erials and Personnel <br />Transportation 6 <br />4.2.1.2.5 Mofiitor Water System 7 <br />4.2.1.2.6 Fl~.ime Water System 8 <br />4.2.1.2.7 Sl~irry Pumping System 8 <br />4.2.2 Conservation of Coal 8 <br />4.2.3 Operation Descri~~tion - 5-Year Permit <br />Period 9 <br />4.2.4 Roads 10 <br />4.2.4.1 Access Roac] 10 <br />4.2.5 Cut and Fill Vo1Lm~e~ 11 <br />4.2.6 Signs and Marker:~ 12 <br />4.3 Operation Plan - Permit Area 13 <br />4.3.1 Production Methoc.9s and Equipment 13 <br />4.3.2 Operation Descri~~t:ion 15 <br />• 4.3.2.1 Permit <br />Disturbed, and Affected <br />: <br />Acreages 20 <br />4.3.2.2 Personnel Requirements 21 <br />4.3.2.3 Power Requirements 21 <br />4.3.3 Surface Facilities 21 <br />4.3.3.1 Primary I'aicilities 22 <br />4.3.3.1.1 Pu_*.iping and Sizing 22 <br />4.3.3.1.2 Crusher 25 <br />4.3.3.1.3 Coal Washing Plant 25 <br />4.3.3.1.4 Coil Storage 26 <br />4.3.3.1.5 Loadout Facility 26 <br />4.3.3.2 Auxiliary Facilities 27 <br />4.3.3.2.1 Offices 28 <br />4.3.3.2.2 Chzingehouse 28 <br />4.3.3.2.3 Warehouse 28 <br />4.3.3.2.4 Sh~,ps 28 <br />4.3.3.2.5 Eicnctrical Distribution <br />Center 29 <br />4.3.3.2.6 W:Zi:er and Sewage Treatment 29 <br />4.3.3.3 Water System 29 <br />4.3.3.4 Construction of Surface Facilities 34 <br />4.3.3.4.1 Prc:paration Plant 34 <br />4.3.3.4.2 Th.'.ckener 34 <br />4.3.3.4.3 Sl.irry Tank 35 <br />4.3.3.4.4 Cori]. Storage 35 <br />4.3.3.4.5 Co:ix'se Refuse (Temporary <br />NCIG - Coal Ridge ~1 •S-i MJG/1000/8-20-94 <br />