Laserfiche WebLink
1 <br />,• <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />i <br /> <br />Table 3 <br />Stream Depletion Rates <br />Yoast Mine Shop Well <br />Stream Stream Depletion <br />ercent of well um a e <br />Sa a Creek 8.650°~ <br />Grass Creek 10.270% <br />Yam a River above Grass Creek 0.970% <br />Fish Creek 0.160% <br />Middle Creek 0.180% <br />Trout Creek 0.126°0 <br />Total 20.356% <br />Notes: <br />1/ From Tab/e 2 of June 17, 1994 report by GeoTrans, lnc. entitled <br />"A Two-Dimensional Model of the Trout Creek Sandstone <br />Simulating the Effects of Pumpage on Stream Flows -Seneca llW <br />and Voast Mine Sites". <br />21 The depletion rates represent the dep/etion rate at the end of <br />year 15 pumping at a constant rate. <br />P101, TABLES.WK4 <br />